background image

107304

For more information, visit www.desatech.com

For more information, visit www.desatech.com

17

17

Vertical Termination Configurations

Figure 36 through 39 show four different configurations for vertical
termination. All connections must be sealed with high temperature
silicone sealant as specified in the second warning statement on
page 12.

Venting with One 90

°

 Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

Figure 36 - Vertical Venting Configuration Using One 90

°

 Elbow

Note: Install restrictor
into 4" collar of burner
system as shown.

VENTING INSTALLATION

Continued

Figure 34 - Cathedral Ceiling Support Box Installation

Non-hardening Mastic
under all edges of support
box before nailing

Figure 35 - Installed Cathedral Ceiling Support Box

Cut hole 1/8" larger than support
box when projected onto roofline

2" minimum below

finished ceiling

Cathedral ceiling
support box

Level

7.

Twist-lock the vent cap onto the last section of vent pipe and
seal outer pipe connection with high temperature silicone seal-
ant as specified in the second warning statement on page 12.

Note:

 If the vent pipe passes through any occupied areas above the first

floor, including storage spaces and closets, you must enclose pipe. You
may frame and sheetrock the enclosure with standard construction
material. Make sure and meet the minimum allowable clearances to
combustibles. Do not fill any of the required air spaces with insulation.

Cathedral Ceiling Installation

1.

Remove shingles or other roof covering as necessary to cut the
rectangular hole for the support box. Mark the outline of the
cathedral ceiling support box on the roof sheathing using the
locating hole as a center point.

2.

Cut the hole 1/8" larger than the support box outline (see
Figure 34).

3.

Lower the support box through the hole in the roof until the
bottom of the box extends at least 2" below the ceiling (see
Figure 34). Align the support box vertically and horizontally
using a level. Temporarily tack the support box in place through
the inside walls and into the roof sheathing.

4.

Using tin snips, cut the support box from the top corners down
to the roofline and fold the resulting flaps over the roof sheath-
ing (see Figure 35). Apply a bead of non-hardening mastic around
the top edges of the support box to make a seal between the box
and the roof. Nail in place with roofing nails. Remove any com-
bustible material that might be inside of the support box.

5.

Complete the cathedral ceiling installation by following the same
procedures outlined in steps 2 through 7 for Flat Ceiling Instal-
lation
, page 16

.

VENTING INSTALLATION

Installation for Vertical Termination (Cont.)

PA-47

Summary of Contents for SDVBNC

Page 1: ...ore or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance Installation and service must be performed by a qualified installer service agency or the gas s...

Page 2: ...I Z21 88 and CSA 2 33 as a Vented Gas Fireplace Heater and is listed and tested by the CanadianStandardsAssociationtotheaboveteststandards Thisstove with burner system is a vented product This stove w...

Page 3: ...cook food or burn paper or other objects 13 Never place anything on top of stove 14 Do not use any solid fuels wood coal paper cardboard etc in this stove Use only the gas type indicated on burner sy...

Page 4: ...cause odors LOCAL CODES Install and use stove and burner system with care Follow all local codes In the absence to local codes use the current National Fuel Gas Code ANS Z223 1 NFPA 54 USA or the curr...

Page 5: ...Remove all screws fastening the wood frame enclosure Spread wood frame open and lift away from plastic bagged stove body The bottom pieces of pallet wood will remain bolted to the stove body 3 Remove...

Page 6: ...p bolt until snug Make sure door moves freely 11 Install door catch bolt M8 x 1 25 55mm with two M8 hex nuts into threaded hole on stove body see Figure 9 Use an adjust able wrench or a 12mm socket Th...

Page 7: ...und plate Discard these screws wash ers and screen They are for vent free use only see Figure 14 16 Replace the two screws from step 14 to reassemble the front plate and the front surround plate Set t...

Page 8: ...and Bottom Cover from Stove Body Speed Control Blower Control Knob Locknut Blower Assembly Thermal Switch and Bracket Control Shaft TOP VIEW Stove Body Rear Cover Bottom Cover Hex Screws Mounting Scre...

Page 9: ...or and thermal switch are securely attached and that the screw retaining the green ground wire is tight Green Ground Wire Wiring Diagram Decal Speed Control Black Wire White Wire Blue Wire Power Cord...

Page 10: ...utility buildings within 24 from the front of the termination cap Do not locate termination cap where excessive snow or ice build up may occur Be sure to clear vent termination area after snow falls t...

Page 11: ...pply inlet 72 inches 1829mm minimum L clearance above paved side walk or a paved driveway located on public property 84 inches 2133mm minimum M clearance under veranda porch deck 12 inches 305mm minim...

Page 12: ...l sections of this vent system require a minimum clearance of 2 from the top of the pipe and 1 minimum to the sides and bottom Vertical sections of this system require a minimum of 1 clear ance to com...

Page 13: ...slide straight into matching slots on the male ends of adjacent pipes and fittings All connections must be sealed with high temperature silicone sealant as specified in the second warn ing statement...

Page 14: ...6 Position the vent termination in the center of exterior wall firestop with arrow on termination pointing up For Noncombustible Exterior Apply a bead of non harden ing mastic around the outside edge...

Page 15: ...Figures 29 through 31 show different configurations for venting with horizontal termination Each figure includes a chart with vertical minimum maximum and horizontal maximum dimensions which must be...

Page 16: ...s must be sealed with high temperature sili cone sealant as specified in the second warning statement on page 12 Be sure all pipe and elbow connections are fully twist locked see Figure 24 page 13 3 C...

Page 17: ...mustenclosepipe You may frame and sheetrock the enclosure with standard construction material Make sure and meet the minimum allowable clearances to combustibles Donotfillanyoftherequiredairspaceswith...

Page 18: ...urationUsingTwo90 Elbows VENTING INSTALLATION Continued Venting with Two 90 Elbows Vertical V Horizontal H1 Horizontal H2 5 min 2 max 6 min 4 max 7 min 6 max 8 min 8 max 20 max 8 max Figure37 Vertical...

Page 19: ...l Vent Kit Includes 36 Snorkel Termination 90 Elbow 7 12 Adjustable Coaxial Pipe 6 Pipe Adaptor 4 Coaxial Pipe WallFirestop DecorativeTrimPlateand18Screws VKR 47 K Roof Vent Kit Includes VerticalHighW...

Page 20: ...t supply an external regulator The external regulator will reduce incoming gas pressure Youmustreduceincominggaspressuretobetween11and 14 inches of water If you do not reduce incoming gas pressure bur...

Page 21: ...Equal To or Less Than 1 2 PSIG 3 5 kPa 1 Close equipment shutoff valve see Figure 43 2 Pressurize supply piping system by either opening propane LP supply tank valve for propane LP gas burner system...

Page 22: ...Apply noncorrosive leak test solution to all gas joints Bubbles forming show a leak Correct all leaks at once Pressure Testing Burner System Gas Connections 1 Open equipment shutoff valve see Figure...

Page 23: ...the back on each side of the base see Figure 47 WARNING Do not connect this thermostat to a power source Electrical shock and or fire hazard will occur Figure 47 Back View of Thermostat Base Feed wire...

Page 24: ...Terminal Wires Battery Cover 9 Volt Battery Remote Control Unit Battery Housing LO H I P I L O T OFF ON Figure 50 Installing Remote Receiver Figure 52 Installing Battery in Hand Held Remote Control U...

Page 25: ...osition the parts in accor dance with these diagrams or failure to use only parts specificallyapprovedwiththisburnersystemmayresult in property damage or personal injury INSTALLING LOGS LAVA ROCK AND...

Page 26: ...his appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been...

Page 27: ...In the AUTO mode the thermostat in the hand held re mote unit controls the room temperature To increase the room temperature press the top arrow of the TEMP but ton To lower the room temperature pres...

Page 28: ...blower has an ON setting and an OFF setting The blower will only run when the switch is in the ON position In the OFF position the blower will not operate If you are using CDA3620TB blower with optio...

Page 29: ...g refer to Installing Logs Lava Rock and Glowing Embers page 25 to properly replace logs Use a vacuum cleaner to remove any carbon build up on logs Replace log s if broken See Replacement Parts on pag...

Page 30: ...ty or partially clogged pilot 5 Thermocouple connection loose at con trol valve 6 Thermocouple damaged 7 Control valve damaged REMEDY 1 Reconnect ignitor cable 2 Free ignitor cable if pinched by any m...

Page 31: ...d from line Have gas line checked by local pro pane LP or natural gas company 3 Clean burner see Cleaning and Maintenance page 29 or replace burner orifice 1 Adjust the log set so that the flame does...

Page 32: ...efective 1 Gas leak See Warning statement above 1 Improper log placement 2 Air holes at burner inlet blocked 3 Burner flame holes blocked 4 Improper vent configuration OBSERVED PROBLEM Burner system p...

Page 33: ...ion after servicing Note Use only original replacement parts This will protect your warranty coverage for parts replaced under warranty PARTS UNDER WARRANTY Contact authorized dealers of this product...

Page 34: ...5 w c 11 0 w c Thermal Efficiency 70 70 Dimension Inches mm HxWxD Stove and Burner System 27 x 26 1 4 x 26 1 8 27 x 26 1 4 x 26 1 8 685 8 x 666 7 x 663 4mm 685 8 x 666 7 x 663 4mm Carton Insert Only...

Page 35: ...PC DVBNA CONVERSION KIT Not Shown For natural gas models Allows burner system to be converted from natural gas to propane LP gas THERMOSTATICALLY CONTROLLED BLOWER KIT CDA3620TB For all models Provid...

Page 36: ...n visit www desatech com 36 LO H I P I L O T OFF ON 24 4 19 20 21 23 26 1 26 4 26 2 26 3 29 24 4 25 4 1 28 4 7 8 9 10 11 13 12 15 16 17 22 4 2 3 6 22 27 14 4 5 4 31 33 30 32 18 4 ILLUSTRATED PARTS BRE...

Page 37: ...Grate 1 19 106036 01 106036 01 Burner Natural 1 106036 02 106036 02 Burner Propane LP 1 20 104506 16 104506 16 Orifice Natural 1 104506 17 104506 17 Orifice Propane LP 1 21 14528 14528 Brass Elbow 1...

Page 38: ...e information visit www desatech com 38 ILLUSTRATED PARTS BREAKDOWN AMITY STOVE CHASSIS SCIVFC SERIES PSCIVFC SERIES Indicates Color Suffix Designation 2 5 8 7 4 6 5 5 7 1 7 2 5 4 7 3 1R 1C 1L 3 ILLUS...

Page 39: ...5 04 One Leg Burgundy Red 4 Total Per Stove 1 104175 05 One Leg Forest Green 4 Total Per Stove 1 104175 06 One Leg Metallic Charcoal 4 Total Per Stove 1 104175 07 One Leg Porcelain Enamel Red 4 Total...

Page 40: ...desatech com For more information visit www desatech com 40 ILLUSTRATED PARTS BREAKDOWN STOVE CHASSIS P FC SERIES 1R 1C 1L 5 8 8 7 4 6 5 5 7 1 7 2 5 4 7 3 2 3 Discarded During Assembly ILLUSTRATED PAR...

Page 41: ...celain Enamel Green 4 Total Per Stove 1 104175 15 One Leg Porcelain Enamel Red 4 Total Per Stove 1 6 104176 01 Leg Leveler bolt M8 x 1 25 55mm Long 4 Total Per Stove 1 7 104177 02 Hardware Kit 1 7 1 D...

Page 42: ...ive stove and burner system will be the responsibility of the owner TO THE FULL EXTENT ALLOWED BY THE LAW OF THE JURISDICTION THAT GOVERNS THE SALE OF THE PRODUCT THIS EXPRESS WARRANTY EXCLUDES ANY AN...

Reviews: