5. Installation of Chamber
5.2 INSTALLATION OF CHAMBER - SECTION C
CHANNEL TO CHAMBER
Connecting discharge, cable duct and vent
Wrap the thread on a high pressure male
iron with PTFE tape.
Screw the high pressure male iron into the
socket.
Apply solvent cement around the first 20mm
of the external face of the discharge, cable
duct and vent pipe and internal side of their
respective male iron.
Push discharge, cable duct and vent pipe
into their respective male iron, twisting the
pipe as it is pushed into the male iron to
remove any trapped air.
01992 523 523 | [email protected] | www.deltamembranes.com
FOUL V3 INSTALLATION GUIDE
10
9
10
11
12