5. Installation of Chamber
5.5 INSTALLATION OF CHAMBER - SECTION D3
CHANNEL TO CHAMBER
Backfill around chamber with concrete
To be followed when installing chamber in the ground with a reinforced cage.
Completely fill chamber with water.
Fill void between soil and chamber with
concrete (min. C35 grade) or as per
engineer’s drawings.
Allow concrete to cure.
01992 523 523 | [email protected] | www.deltamembranes.com
FOUL V3 INSTALLATION GUIDE
20
21
22
14