5. Installation of Chamber
5.3 INSTALLATION OF CHAMBER - SECTION D1
CHANNEL TO CHAMBER
Backfill around chamber with concrete
To be followed when installing chamber in an RC box.
Check all pipes are connected to the
chamber correctly.
Completely fill chamber with water.
Fill void between RC box and chamber
with concrete (min. C35 grade) or as per
engineer’s drawings.
01992 523 523 | [email protected] | www.deltamembranes.com
FOUL V3 INSTALLATION GUIDE
12
14
15
16