5. Installation of Chamber
5.8 INSTALLATION OF CHAMBER - SECTION G
Installing pump in chamber and AlertMaxx2 EC or Delta HLA
Fill chamber half full with water.
Slide the DC65 over the discharge arm and
lower the pump in to chamber to release
any trapped air. Slide the DC65 up to join the
manifold to the discharge arm.
Tighten the two screws on the DC65 to seal
the pipework.
When installing a high level alarm, refer to
the AlertMaxx2 EC installation instructions.
01992 523 523 | [email protected] | www.deltamembranes.com
27
28
29
30
17