7
Track Installation
1. Install the adjusted track on the horizontal conveying vibration motor seat, and adjust the
distance; the distance away from the opening of the flat conveying device board is
approximately 0.2 ~ 0.5mm. Then, fasten the fixation screws.
2. Install the horizontal conveying device board 4, and fasten the screws.
3. Adjust the upper and right gates at a distance of approximately 0.2 ~ 0.5mm from the track.
Notes
a. During the installation the track, a clearance of 0.2 ~ 0.5mm shall be kept from the horizontal
conveying device board (opening) such that no contact shall be formed therebetween.
b. If the track cannot be installed successfully, please check whether the container funnel is
installed at an overly low position.
c. The upper and right gates shall be kept at a clearance of 0.2 ~ 0.5mm from the track.