background image

Automatic Screw Feeder

 

User Manual

 

Y2F152-1-002

 

DRFF-300R

Delta Regis Tools Inc

.

7370 Commercial Circle

Fort Pierce, FL

34951

1-888-500-2755

www.deltaregis.com

Summary of Contents for DRFF-300R

Page 1: ...Automatic Screw Feeder User Manual Y2F152 1 002 DRFF 300R Delta Regis Tools Inc 7370 Commercial Circle Fort Pierce FL 34951 1 888 500 2755 www deltaregis com...

Page 2: ...ded by the original manufacturer in order to prevent damages of the machine and impacts on the normal operation The inner tracks inside the machine are essential components therefore please do not dam...

Page 3: ...Track Width 5 Track Installation 7 Adjustment of Keep Board 8 Adjustment of Infrared Device 9 Adjustment of Dispensing Mechanism 10 Adjustment of Container Funnel Inside Cylinder 13 Adjustment of Brus...

Page 4: ...ear specification sheet for sliding track rear 20 10 0 2mm 2pcs 0 5mm 6pcs Operation manual 1 Jig plates 1pcs each for 0 8 1 0 1 2 1 5 2 0 Check Screw Dimension Before the use of the Automatic Screw F...

Page 5: ...achine PCB Function and Panel Hole Locations A LOCK GATE Gate adjustment hole B POWER Power switch C INDICATION LED signal indicator D DC POWER DC power input hole E GROUNDING Grounding hole F SIGNAL...

Page 6: ...g to the screw dimension Track Adjustment Track Removal 1 Remove the fixation screws 6 pcs at the front cover of the housing and remove the front cover of the housing 2 Face the machine and use the eq...

Page 7: ...4 4 Remove the horizontal conveying device board 4 and track fixation screws 5 Remove the track Track fixation screws Horizontal conveying device board screw...

Page 8: ...n screws at the bottom of the track 2 Remove the screws at the rear of the track and remove the jig plate 3 Install the jig plate at the front of the track and adjust the clearance between the left an...

Page 9: ...4 2 2 0 0 2 0 5 4 2 2 5 0 0 2 0 5 10 5 2 2 3 0 2 2 0 5 4 2 4 5 After adjustment is complete take a screw and place on the track followed by sliding it from the rear toward the front It is acceptable...

Page 10: ...fasten the screws 3 Adjust the upper and right gates at a distance of approximately 0 2 0 5mm from the track Notes a During the installation the track a clearance of 0 2 0 5mm shall be kept from the...

Page 11: ...p board for securing the keep board 2 Use the jig plate to adjust the height of the keep board and fasten the screws in Step 1 Notes a During the adjustment of the keep board the screws in Step 1 shal...

Page 12: ...screws 2 Adjust the infrared hole position reception to expose half of the hole and then fasten the screws in Step 1 Notes a Please make sure that half of the SENSOR reception hole position is exposed...

Page 13: ...front end of the dispensing mechanism is parallel with the front end of the base plate 2 Unfasten the fixation screws on the horizontal conveying device board opening 3 Align the horizontal conveying...

Page 14: ...ront end of the track it is prohibited to be higher than the plane at the front of the track 5 Unfasten the infrared securement base screws adjust the base height such that it is just in contact with...

Page 15: ...tes a The horizontal conveying board opening shall be aligned with the track center and the top plane shall not be higher than the top plane of the front end of the track b The completely adjusted tra...

Page 16: ...ch screws onto the track 1 Use the equipped hex key wrench to unfasten the hex key screws at the rear of the machine 2 Adjust the V shape of the container funnel to align with the track center and the...

Page 17: ...eep board and adjust to the gate opening unfasten the brush fixation screws and manually adjust the brush such that during the rotation of the brush the brush end just contacts with the screw heads Fa...

Page 18: ...height adjustment of the brush is complete manually rotate the brush again in order to ensure that it is able to operation properly b If there is difference between the brush lengths at the front and...

Page 19: ...tank The screws are added onto the two left and right sides equally to location at approximately 1 2mm from the lower edge of the track in front of the gate opening The quantity of screws is approxima...

Page 20: ...Board Connection Connect PLC signal input Connect PLC positive power Signal board wiring diagram 1 of mainboard CN5 In2 of sign connection board J1 GND of mainboard CN5 GND of sign connection board J1...

Page 21: ...ing and LED display screen flashes Press the SET key the first time the system enters into the total quantity ten thousandth digit thousandth digit setting LED display screen flashes and the LED indic...

Page 22: ...ey the sixth time the system enters into the vibration delay setting LED display flashes and displays and at the same time LED indicator SET is lit up then use UP or DN key to adjust the delay time se...

Page 23: ...keys or other key is pressed within 3S the system confirms the setting is complete and a buzzer is sounded as an indication of the completion 1 10 Under the standby or operation state press the SET k...

Page 24: ...tween the track clearance and the screw Adjust the clearance width at the left and right boards of the track Gate opening with screw s in abnormal orientation brush fails to remove such screw s Adjust...

Page 25: ...from the machine and use cotton dipped with alcohol or cleaning naphtha to wipe the track and the screw sliding surface inside the track in particular Use the equipped hex key wrench to check whether...

Page 26: ...placement of consumable parts brush motor track etc 2 Under the following condition the warranty repair becomes void automatically Damages due to erroneous or improper operations accidents or natural...

Page 27: ...ard Customer Name Telephone Address Purchase Date Dealer Seal Machine Name Automatic Screw Feeder Model No Instrument Serial No Applicable Screw Specification 1 0 5 0mm Power Source DC IN 12V Dimensio...

Reviews: