Figure 137. Installing the left control panel
3
Connect the control panel cable to the system board connector.
Next steps
1
Install the
2
3
Place the system into the rack. For more information, see the Rail Installation Guide available at
.
4
Install the
5
, install
6
If removed,
7
Follow the procedure listed in
After working inside your system
.
Removing the right control panel
Prerequisites
1
Follow the safety guidelines listed in
2
Power off the system and all attached peripherals.
3
Ensure that all internal cables are routed correctly and connected, and no tools or extra parts are left inside the system.
4
, remove
5
Remove the
.
6
Remove the system from the rack and place it on an ESD work bench. For more information, see the Rail Installation Guide available at
.
7
If installed,
8
.
168
Installing and removing system components