2
Follow the procedure listed in
Before working inside your system
.
3
Step
NOTE:
The screws on top of the air shroud are meant to secured the T_standoff. Do not remove the crews when
removing the air shroud.
Slide the air shroud backward to unlock it from the T_standoff and lift the air shroud out of the system.
Figure 14. Removing the air shroud
Next step
1
Installing the air shroud
Prerequisites
1
Follow the safety guidelines listed in
2
If applicable, route the cables inside the system along the system wall and secure the cables by using the cable-securing bracket.
Steps
1
Align the slot on the air shroud with the T_standoff on the chassis.
2
Lower and slide the air shroud into the system until it is firmly seated.
Installing and removing system components
47
Summary of Contents for DSS8440
Page 100: ...Cable Routing Figure 82 Cable Routing 7 100 Cable Routing ...
Page 107: ...Figure 88 Fan cable assembly to fan bracket Cable Routing 107 ...
Page 109: ...Figure 91 Fan cable assembly to fan bracket Cable Routing 109 ...
Page 110: ...Fan cable MB PDB assembly to MB Figure 92 Fan cable MB PDB assembly to MB 110 Cable Routing ...
Page 114: ...IDC cable MB PDB assembly to PDB Figure 99 IDC cable MB PDB assembly to PDB 114 Cable Routing ...
Page 115: ...IDC cable MB PDB assembly to MB Figure 100 IDC cable MB PDB assembly to MB Cable Routing 115 ...
Page 138: ...System Board Connectors Figure 133 System Board Connectors 138 Jumpers and connectors ...