4
TrioPure
TM
Sanitation System
2e-2 Plumbing Configurations Figures 1-2
The plumbing diagrams shown on the following pages are schematic representations of the various pool
configurations and plumbing lengths are for reference only.
Figure 1a
- (Pool Only, No ICS, Solar):
• Manifold to be plumbed between the filter and heater. In the case of solar, the manifold is to be
installed before the diverter valve that serves both the solar and non-solar heaters.
• Return from
TrioPure
TM
plumbed to a dedicated 1½” return to the lowest point of the pool, where
possible.
•
To minimize the size of ozone bubbles use a dispersion cap or main drain cover. This may require
a stub-up to the appropriate size for the fitting.
•
The illustration above makes use of the pressure drop across the heater to maintain a high-pressure
differential when the pool pump is running.
•
Note the check valve installed between the heater and the TrioPure
™
return T-fitting. This prevents
ozone from getting into the heater.
DEL Ozone · San Luis Obispo, CA 93401 · USA · 800-676-1335 · Fax: 805-541-8459
Figure 1b
Summary of Contents for TrioPure-25
Page 26: ......