
1 2
| O A S I S P O L Y C A R B O N A T E V E R A N D A I N S T A L L A T I O N G U I D E
1 3
If the wall profile does not need to be shortened, you can mount it straight away. Otherwise you must first cut the wall profile to the
desired length. Do not place the supplied rubber strip in the wall profile yet; this rubber strip is fit in place after mounting.
6.1 MOUNTING THE WALL PROFILE
6. ASSEMBLY
500mm
100mm
500mm
Ø8mm
B
1
B
Ø8mm
1
6. Assembly
6.1 Mounting the wall profile
If the wall profile does not need to be shortened, you can mount it straight away. Otherwise you
must first cut the wall profile to the desired length. Do not place the supplied rubber strip in the wall
profile yet; this rubber strip is fit in place after mounting.
1. Drill holes in the wall profile at 50 cm intervals. Begin approximately 10 cm from one
end and finish approximately 10 cm from the other end. Use a metal drill bit with a diameter of 8
mm.
2. Now mark the wall with a line to indicate where the bottom of the wall profile should be.
Place the wall profile on the line and then mark the holes that you pre-drilled
in your wall profile.
3. Now use a concrete drill bit with a diameter of 8 mm to drill the holes. Make sure the wall profile
is level.
500mm
100mm
500mm
Ø8mm
B
1
B
Ø8mm
1
6. Assembly
6.1 Mounting the wall profile
If the wall profile does not need to be shortened, you can mount it straight away. Otherwise you
must first cut the wall profile to the desired length. Do not place the supplied rubber strip in the wall
profile yet; this rubber strip is fit in place after mounting.
1. Drill holes in the wall profile at 50 cm intervals. Begin approximately 10 cm from one
end and finish approximately 10 cm from the other end. Use a metal drill bit with a diameter of 8
mm.
2. Now mark the wall with a line to indicate where the bottom of the wall profile should be.
Place the wall profile on the line and then mark the holes that you pre-drilled
in your wall profile.
3. Now use a concrete drill bit with a diameter of 8 mm to drill the holes. Make sure the wall profile
is level.
1. Drill holes in the wall profile at 500mm intervals. Begin approximately 100mm from one end and finish approximately
100mm from the other end. Use a metal drill bit with a diameter of 8mm.
2. Now mark the wall with a line to indicate where the bottom of the wall profile should be. Place the wall profile on the line
and then mark the holes that you pre-drilled in your wall profile.
3. Now use a concrete drill bit with a diameter of 8mm to drill the holes. Make sure the wall profile is level.
6.1
Summary of Contents for OASIS POLYCARBONATE VERANDA
Page 35: ...3 5 DESIGN GRID ...