Water treatment boiler system D 110 L 

 

 

 

 

 

 

Seite 4 

2 Transport und storage 

 

2.1 Delivery 

 
The unit is delivered on a pallet. To prevent effects of weather or damages, the unit is 
wrapped in a plastic film.  
Transport damages have to be documented at once during the handing over of the 
carrier or another supplier. Please note the possible damages additionally on the way bill. 
 

2.2 Transport

 

 
The Transport has to be handled with care to avoid damages due to faulty handling or 
imprudence. 
In winter and at risk of frost, you have to empty the whole device (pumps, filter housings, 
tank.) preliminary to the transport.  
 

Attention:

 Transport of the machine (also change of location) only with a drained device. 

 

2.3 Storage 

 
In order to avoid damages, the installation has to be kept in a dry area with no access for 
unauthorized persons. 
 

Because of risk of frost in winter you have to observe the following: 

  Empty water pipes, filter housing and tank 

  Place the water treatment system in a place protected against frost.  

 
 

Advice for the draining of the tank: 

In order to drain, move the ball valve. 

 

 

Summary of Contents for D 110L

Page 1: ...Instruction manual Water treatment boiler system D 110 L Manufacturer deconta GmbH Im Geer 20 D 46419 Isselburg Description Water management D 110 L Type No 503 Serial No...

Page 2: ...L Seite 2 Table of contents on page 1 Basic safety advice 3 2 Transport und storage 4 3 Volume of delivery 5 4 Technical description 5 5 Technical data 7 6 Initial operation 8 7 Maintenance and care...

Page 3: ...n the event of non observance deconta assumes no liability To ensure safety during operation of the unit the following must be strictly observed Do not use in potentially explosive areas Necessary rep...

Page 4: ...to avoid damages due to faulty handling or imprudence In winter and at risk of frost you have to empty the whole device pumps filter housings tank preliminary to the transport Attention Transport of...

Page 5: ...o regulations During asbestos sanitation works within closed rooms you have to exclude that the asbestos fibres leave the sanitation area uncontrolled and endanger the human health and the environment...

Page 6: ...9 10 11 12 13 14 15 16 17 0 10 20 30 40 50 60 70 80 90 100 0 77 0 97 1 22 1 54 1 93 2 44 3 07 3 87 4 87 6 14 7 74 9 75 12 3 15 5 19 5 24 6 30 9 Meas Point Diameter Effectiveness 1 0 77 84 3 2 0 97 90...

Page 7: ...2000Watt Heatup phase 37 C with full tank approx 2 h Pumps 12 V 6 5 A Self priming and dry run safe Flow rate max 10 6 l min Fresh water supply automatic via fresh water connection or manually via fi...

Page 8: ...ect to power supply Adjust temperature at heating rod the heating rod works at all switch settings of the function switch but not before a sensor controlled minimum fill level is reached At use of the...

Page 9: ...hower water pump sewage pump and heating rod operative Safety advice During works on the device always disconnect the plug Operate the device only with mains which are secured with fault current prote...

Page 10: ...ter change only if the device is switched off Demount dirty filters only in wet shape to avoid contamination Use only approved filters It is prohibited to use damaged filter candles Filter change Loos...

Page 11: ...1 7 4 Cleaning sewage pump Remove cover plate Remove hoses Remvoe fastening screws of pressure switch ATTENTION Do not alter the middle adjusting screw Remove fastening screws of pump head and take of...

Page 12: ...Instruction manual Water treatment boiler system D 110 L Seite 12 Take out valve plate and clean front and back Valve plate...

Page 13: ...Instruction manual Water treatment boiler system D 110 L Seite 13 8 Circuit diagram...

Page 14: ...ied harmonised standards EN 292 EN 60335 1 Applied national standards DIN VDE 0701 DIN VDE 0702 A Evers Leitung Entwicklung Isselburg 23 02 2011 The copyright of this instruction manual remains the pr...

Reviews: