Instruction manual

 

 

Water treatment boiler system D 110 L 

 

 

 

 

 

 

Seite 5 

3 Volume of delivery 

 
The volume of delivery of a water treatment boiler system, unless no other agreements 
have been made, consists of: 
 

 Water treatment system D110l 

 Filter set 

 Instruction manual 

 
 

Return delivery after termination of rental period 

 
We have to insist on following conditions for the return delivery in order to protect our 
clients and in accordance with the rules for hazardous materials transportation: 
 

  As listed above 

  Well cleaned (ready for use) 

  Without binder remains 

 Without 

damages 

 Without 

filter 

 
 

4 Technical description 

 

4.1 Use according to regulations 

 
During asbestos sanitation works within closed rooms, you have to exclude that the 
asbestos fibres leave the sanitation area uncontrolled and endanger the human health 
and the environment. For this reason, personnel must leave the sanitation area through a 
lock system and take a shower while leaving. 
 
The deconta water treatment assumes the heating of the shower water and takes over 
the filtering of the contaminated sewage water. 
 

4.2 Unit description 

 
This is an electric warm water storage for the heating of shower water. The tank can be 
filled optionally via the filling port (bucket) or automatically over a connected fresh water 
hose. The water is heated to shower temperature (factory-adjusted approx. 37°C) by an 
electric heating rod.

 

The produced shower water is pumped out via an internal pump and 

filtered. 

Summary of Contents for D 110L

Page 1: ...Instruction manual Water treatment boiler system D 110 L Manufacturer deconta GmbH Im Geer 20 D 46419 Isselburg Description Water management D 110 L Type No 503 Serial No...

Page 2: ...L Seite 2 Table of contents on page 1 Basic safety advice 3 2 Transport und storage 4 3 Volume of delivery 5 4 Technical description 5 5 Technical data 7 6 Initial operation 8 7 Maintenance and care...

Page 3: ...n the event of non observance deconta assumes no liability To ensure safety during operation of the unit the following must be strictly observed Do not use in potentially explosive areas Necessary rep...

Page 4: ...to avoid damages due to faulty handling or imprudence In winter and at risk of frost you have to empty the whole device pumps filter housings tank preliminary to the transport Attention Transport of...

Page 5: ...o regulations During asbestos sanitation works within closed rooms you have to exclude that the asbestos fibres leave the sanitation area uncontrolled and endanger the human health and the environment...

Page 6: ...9 10 11 12 13 14 15 16 17 0 10 20 30 40 50 60 70 80 90 100 0 77 0 97 1 22 1 54 1 93 2 44 3 07 3 87 4 87 6 14 7 74 9 75 12 3 15 5 19 5 24 6 30 9 Meas Point Diameter Effectiveness 1 0 77 84 3 2 0 97 90...

Page 7: ...2000Watt Heatup phase 37 C with full tank approx 2 h Pumps 12 V 6 5 A Self priming and dry run safe Flow rate max 10 6 l min Fresh water supply automatic via fresh water connection or manually via fi...

Page 8: ...ect to power supply Adjust temperature at heating rod the heating rod works at all switch settings of the function switch but not before a sensor controlled minimum fill level is reached At use of the...

Page 9: ...hower water pump sewage pump and heating rod operative Safety advice During works on the device always disconnect the plug Operate the device only with mains which are secured with fault current prote...

Page 10: ...ter change only if the device is switched off Demount dirty filters only in wet shape to avoid contamination Use only approved filters It is prohibited to use damaged filter candles Filter change Loos...

Page 11: ...1 7 4 Cleaning sewage pump Remove cover plate Remove hoses Remvoe fastening screws of pressure switch ATTENTION Do not alter the middle adjusting screw Remove fastening screws of pump head and take of...

Page 12: ...Instruction manual Water treatment boiler system D 110 L Seite 12 Take out valve plate and clean front and back Valve plate...

Page 13: ...Instruction manual Water treatment boiler system D 110 L Seite 13 8 Circuit diagram...

Page 14: ...ied harmonised standards EN 292 EN 60335 1 Applied national standards DIN VDE 0701 DIN VDE 0702 A Evers Leitung Entwicklung Isselburg 23 02 2011 The copyright of this instruction manual remains the pr...

Reviews: