
DCRS-9800 InstallManual Chapter 2 Hardware Installation
2-8
z
Category 5 cable with RJ-45 connector
2.6 Hardware Installation
The installation of the DCRS-9800 includes the following:
&
Switch
mounting
Desktop
installation
Rack-mounting the switch
&
Switch
grounding
&
Cards and modules installation
&
Connecting to the Console
Connecting to the Console port
&
Connecting to the Management Port
Connecting to the Ethernet port
&
SFP transceiver installation
Install the SFP transceiver in the SFP slot
&
XENPAK
transceiver
installation
Install the XENPAK transceiver in the XENPAK slot
Copper Cable/Fiber cable connection
Ethernet cable connection
Fiber cable connection
&
Power supply connection
2.6.1 Switch Installation
2.6.1.1 Desktop installation
z
Note:
●
Choose a smooth level workbench
●
Verify that the workbench is strong enough to support the DCRS-9808’s fully
configured weight
●
Plan a good position for your DCRS-9808 that is easy to operate and has an
appropriate power source and grounding point.
●
Place the DCRS-9808 safely on the workbench, avoid obstructions on any side of
the switch.
Summary of Contents for DCRS-9800 Series
Page 4: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 2 Fig 1 2 DCRS 9816 Switch...
Page 9: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 7 Fig 1 3 DCRS 9808 Module Outlook...
Page 10: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 8 Fig 1 4 DCRS 9808 Front Panel View...
Page 14: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 12 Fig 1 5 DCRS 9816 Module Outlook...
Page 15: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 13 Fig 1 6 DCRS 9816 Front Panel view...
Page 51: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 11 Fig 2 2 Rack mounting DCRS 9816...