![DCN DCRS-9800 Series Install Manual Download Page 13](http://html1.mh-extra.com/html/dcn/dcrs-9800-series/dcrs-9800-series_install-manual_517070013.webp)
DCRS-9800 InstallManual Chapter 1 Product Overview
1-11
The power block is under the dust gauze. There are two independent power systems:
system power and POE power system, separately used for system power and POE
power, allowing at most four power modules. The power modules insert into the power
slots from the front. A grounding post has been provided on back of the rack for grounding
connections.
In addition, on both sides of the lower section of the chassis, a handler is provided for
easier transport.
Summary of Contents for DCRS-9800 Series
Page 4: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 2 Fig 1 2 DCRS 9816 Switch...
Page 9: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 7 Fig 1 3 DCRS 9808 Module Outlook...
Page 10: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 8 Fig 1 4 DCRS 9808 Front Panel View...
Page 14: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 12 Fig 1 5 DCRS 9816 Module Outlook...
Page 15: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 13 Fig 1 6 DCRS 9816 Front Panel view...
Page 51: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 11 Fig 2 2 Rack mounting DCRS 9816...