Cabled Vantage Pro Console Installation
Vantage Pro Manual
Page 13
Note:
To remove batteries, place the Vantage Pro Console face down on a flat, firm surface. Insert a finger-
tip between the two exposed batteries. Press the middle battery down toward the notch (toward the
“hidden” battery. This will relieve the tension on the first battery and allow you to withdraw it.
3. Replace the battery cover.
After power-up the Vantage Pro will automatically enter Setup Mode. Setup
mode will lead you through setting up and calibrating your station. See “Setup
Mode” on page 22.
Connecting the Cabled Vantage Pro to the
Integrated Sensor Suite (ISS)
The Vantage Pro comes with 40 feet of cable. Maximum cable length from ISS
to console is 1000 feet. See “Optional Accessories” on page 10 to purchase addi-
tional cable.
1. Gently insert the console end of the 4 conductor wire running from the ISS into the
console receptacle marked ISS until it clicks into place.
• WARNING:
Do not force the connector into the receptacle.
2. Ensure that the ISS cable is not twisted through the access hole.
3. Test the connections between the ISS and the console.
Spin the wind cups and change the direction of the vane. If the ISS is pow-
ered and the connection between the ISS and the console is correct, you
should see the wind direction and speed fields changing. Tip the rain bucket
back and forth. You should see rain registering. Check the other fields to
ensure you’re receiving from them, too.
Summary of Contents for and Vantage Pro
Page 1: ......
Page 2: ......
Page 40: ...Chapter 3 Page 40 Vantage Pro Console Manual...
Page 46: ...Troubleshooting Page 46 Vantage Pro Manual...
Page 55: ...Page 55 Vantage Pro Manual...
Page 56: ...Page 56 Vantage Pro Manual...
Page 57: ...Page 57 Vantage Pro Manual...
Page 58: ...Page 58 Vantage Pro Manual...