background image

3

Congratulations! You are now the proud owner of a new EcoMineral Water Sanitiser System. Please read all 

information in this manual carefully before installing or operating your EcoMineral Water Sanitiser System.

Contents

•  Power Supply
•  In-Line Electrolytic Cell
•  2 x Barrel Unions
•  2 x Union Cell Adaptors                     

•  Mounting Kit
•  Flow Switch
•  Installation & Operating Instructions
•  Blanking Cap (plug, o-ring and lock ring)

PACKING LIST ...........................................................................................................................................................2
IMPORTANT INFORMATION .....................................................................................................................................3
INSTALLATION INSTRUCTIONS FOR ECOMINERAL ............................................................................................. 4
CONNECTING THE IN-LINE ELECTROLYTIC CELL TO THE POWER SUPPLY .................................................... 5
CONNECTING THE IN-LINE ELECTROLYTIC CELL FLOW SWITCH  

TO THE POWER SUPPLY .........................................................................................................................................6
PRE-START UP PROCEDURE ..................................................................................................................................7
OPERATION OF YOUR ECOMINERAL SYSTEM ..................................................................................................... 8
CONTROL PANEL LAYOUT .......................................................................................................................................9
ECOMINERAL SPECIAL FEATURES ......................................................................................................................10
AUTOMATIC TIME CLOCK OPERATION ................................................................................................................ 11
MAINTENANCE OF POWER SUPPLY ....................................................................................................................13
MAINTENANCE OF THE IN-LINE ELECTROLYTIC CELL ...................................................................................... 13
DAY TO DAY OPERATION .......................................................................................................................................15
CHLORINE PRODUCTION ......................................................................................................................................16
GENERAL INFORMATION .......................................................................................................................................17
TROUBLE SHOOTING ............................................................................................................................................18
MOUNTING TEMPLATE ..........................................................................................................................................19

Packing List

Included with your EcoMineral System are the following items, please check the contents of the box 

carefully prior to attempting to install the system:

EcoMineral

®

Note: The Sanitiser is not intended for use by young children or infirm 

persons without supervision.  Please ensure that young children are 

supervised to ensure that they do not play with the Sanitiser.

Power connections and wiring must be carried out by an authorised electrician.

Summary of Contents for EMX3600

Page 1: ...this equipment The installation of this product should be carried out by a person knowledgeable in swimming pool plumbing requirements following the installation instructions provided in this manual...

Page 2: ...he chlorination process Periodically check the safety flow switch to ensure it is free to move in the direction of flow as indicated by the arrow on the cell see Diagram A Always check Davey s website...

Page 3: ...POWER SUPPLY 6 PRE START UP PROCEDURE 7 OPERATION OF YOUR ECOMINERAL SYSTEM 8 CONTROL PANEL LAYOUT 9 ECOMINERAL SPECIAL FEATURES 10 AUTOMATIC TIME CLOCK OPERATION 11 MAINTENANCE OF POWER SUPPLY 13 MAI...

Page 4: ...ar monitoring of the electrolytic cell is recommended The Cell is the clear plastic housing containing the plates During the sanitisation process a white powdery Calcium scale may naturally build up o...

Page 5: ...d ventilation is necessary for correct operation Return to pool line Suction Line PUMP FILTER ACCESSORIES IN LINE CELL FLOW SWITCH POWER SUPPLY 240V Two self tapping screws and wall plugs have been pr...

Page 6: ...to the outer titanium rods Fit the white connector to the middle titanium rod as per illustration below EMX2400 EMX3600 NOTE The EcoMineral Cell is supplied with a paddle type flow switch which is to...

Page 7: ...the terminal holes at right angles and tighten the terminals CONNECTING THE FILTER CIRCULATION PUMP TO THE POWER SUPPLY Insert the 3 pin male plug into the 3 pin female socket located at the bottom o...

Page 8: ...0ppm 4 When using the Davey EcoMineral Salt and Davey EcoMineral Activator ensure that TDS levels do not exceed 6 000ppm after its addition to the pool 5 Ensure pH levels are between 7 4 7 6 after the...

Page 9: ...ly for at least 24 hours or until a reading of 3 ppm is reached STABILISER It is essential that pool stabiliser be added and maintained at the rate of 30 50 ppm at all times Do not exceed 100 ppm FOR...

Page 10: ...w Note Polarity LED may be either A or B whichever is on or brightest The RED Operation LED will indicate a number of different possible problem situations Possible Problem Action TDS Level Below Mini...

Page 11: ...the TDS level in the pool decreases the wear on the Cell increases Although EcoMineral Salt and Activator is not consumed in the sanitisation process it is lost through splashing backwashing and on ba...

Page 12: ...ong as the selector switch remains at this position Use the up and down buttons to reach the desired times Hold the buttons down for fast increments Set Timer 1 ON 2 SET THE START TIME FOR THE FIRST R...

Page 13: ...uction to change time Automatic ON 6 FILTRATION SYSTEM SWITCHES ON AND OFF AUTOMATICALLY ACCORDING TO YOUR SET TIMES Select the Automatic ON position on the selector switch A number 6 will appear on t...

Page 14: ...chlorite for an extended period Calcium in the plaster surfaces of a concrete pool Because these conditions vary so much check the Cell at least weekly to begin with to see when either scale or a blue...

Page 15: ...cale is being dissolved from the plates the solution will foam when this foaming action has stopped the Cell is clean and the solution can be returned to the container for future use or discarded appr...

Page 16: ...that you put salt directly in the skimmer box This is a very poor practice as it allows very high concentrations of salt to be passed through your filtration and other pool equipment EcoMineral Salt a...

Page 17: ...Control can be turned anti clockwise Test your chlorine level again the following morning at around the same time If your chlorine level is still high repeat the above process until the correct level...

Page 18: ...l by rain wind and dust There are numerous varieties some are free floating whilst others grow on walls and in cracks and come in different colours Some are more resistant to chemical treatment than o...

Page 19: ...ng 6 Sanitiser fuse blown 7 Dirty Cell 8 Filter needs back washing 9 Flow switch not connected 10 Insufficient water flow through cell 11 Running times incorrect 12 Main house fuse blown 13 Pump motor...

Page 20: ...eplacement of product consumables i e seals bearings or capacitors loss or damage resulting from misuse or negligent handling improper use for which the product was not designed or advertised failure...

Reviews: