DT1310 xx xx
16
20220128-V0
5.3. Connecting the signal processing unit and the
power supply
The following figure shows the wiring plan, connecting the
signal processing unit and the power supply:
Wiring plan, connecting
the signal processing
unit and the power
supply
(see also “Application
example”)
Be careful the polarity of
the cables
Checking the
connections
1. Loosen terminal screws.
2. Insert the wire ends into the open terminals according to
the wiring plan.
3. Screw the terminal in.
4. Check the hold of the wires in terminals by pulling on
them firmly.
Check if the cables are connected properly (have you
connected all the cables, have you connected to the right
place, do not the cable-ends touch each other).
The connection is finished.
5.4. Put the instrument under supply voltage.
Put the instrument
under supply voltage
After you have completed the connections, put the
instrument under supply voltage. If the connection is
correct the green indicator gives light and you can measure
an output signal according to the measured value on the
input.
Summary of Contents for DT1310 Series
Page 1: ...DT1310 xx xx Intrinsically Safe Temperature Resistance Transmitter Operating Instructions...
Page 41: ...DT1310 xx xx 20220128 V0 41 10 2 Application example...
Page 42: ...DT1310 xx xx 42 20220128 V0 10 3 ATEX Tan s tv ny...
Page 43: ...DT1310 xx xx 20220128 V0 43...
Page 44: ...DT1310 xx xx 44 20220128 V0...
Page 45: ...DT1310 xx xx 20220128 V0 45...
Page 46: ...DT1310 xx xx 46 20220128 V0...
Page 47: ...DT1310 xx xx 20220128 V0 47...
Page 48: ...DT1310 xx xx 48 20220128 V0...
Page 49: ...DT1310 xx xx 20220128 V0 49...
Page 50: ...DT1310 xx xx 50 20220128 V0...
Page 51: ...DT1310 xx xx 20220128 V0 51...
Page 52: ......