
RAPID CONFIGURATION
1
AS9132A AND AIM DPM VERIFICATION
:
PG 6000
CAB-MS01
CBX
Main Interface
Host
Matrix 400™
BK-4410
LT-410
Code Surface
Figure 4 – Matrix 400™ in ISO/IEC 15415 and ISO/IEC 15416 Verifier Layout
1. Connect the Matrix 400™ to the CBX connection box.
2. Connect the selected LT-XXX lighting system to the CBX connection box according to the
wiring table below.
3. Connect the CBX to the PG600x power supply unit.
4. Connect the selected communication interface to the Host.
5. Connect the main power supply and switch on the system.
CAUTION
Power is available directly to the Illuminator, independently from the
Power Supply Switch inside the CBX.
Below is a table summarizing the various External Illuminator wiring and power requirements:
Illuminator Wire
Color CBX/Matrix
Signal
Meaning
LT-100
Red
Vdc
10 to 30 Vdc
LT-200 Black
GND
Ground
LT-300
Brown
Vdc
10 to 30 Vdc
Black
GND
Ground
Yellow/Green
Earth
Shield/Earth
Ground
LT-210, LT-314, White
Vdc
24 Vdc
LT-316, LT-410
Black
GND
Ground
LT-510, LT-511
Shield
Earth
Shield/Earth Ground
5
Summary of Contents for Matrix 400
Page 1: ...MATRIX 400 Code Quality Verifier Solution Manual ...
Page 8: ......
Page 86: ...www automation datalogic com ...