DATALOGIC
C-BOX 200
Installation -
3
2.2 OPENING THE DEVICE
To install the C-BOX 200 or during normal maintenance, it is necessary to
open it by unscrewing the four cover screws:
WARNING
The C-BOX 200 must be disconnected from the
power supply during this operation.
Figure 2.2 - Opening the C-BOX 200
It is possible to perform the following operations:
•
Proceed with the cable connections (see paragraph 2.4.2).
•
Set the multiplexer address selection on the rotary switches.
•
Mount the C-BOX 200 to a wall or panel.
Summary of Contents for C-BOX 200
Page 1: ...C BOX 200 Installation Manual...
Page 2: ...C BOX 200 INSTALLATION MANUAL...
Page 9: ...viii...