DATALOGIC
C-BOX 200
Installation -
9
The C-BOX 200 spring clamp connector pinouts are indicated in the following
table.
Refer to the scanner Installation Manual for details.
Pin
Name
1, 3, 5
VS
2, 4, 6
GND
7, 8
EARTH GROUND
*9, 13
RS485 CABLE SHIELD
*10, 14
RS485 REF
*11, 15
*12, 16
RTX485-
20, 33, 34, 40
Reserved
21
OUT1+
23
OUT2+
27
EXT TRIG+
28
EXT TRIG-
35
TXA
37
RXA
39
SGND
DS2100
DS2400
DS4300
DS4600
22
OUT REF
OUT1-
24
OUT REF
OUT2-
25, 26
NC
Reserved
29
NC
IN1+
30
NC
IN1-
31
NC
IN2+
32
NC
IN2-
36
RTSA
GND
38
CTSA
SGND AUX
*
The signals on pins 9, 10, 11 and 12 are repeated on pins 13, 14, 15 and 16 to facilitate
network connections (i.e. Multiplexer connections using the RS485 half-duplex Interface). In
this way the network bus can enter and exit the C-BOX from different spring clamps but be
physically connected together.
NOTE
Pin 7 or 8 should be connected to the earth ground.
Pin 17, 18 and 19 are not present in the C-BOX 200 model.
Summary of Contents for C-BOX 200
Page 1: ...C BOX 200 Installation Manual...
Page 2: ...C BOX 200 INSTALLATION MANUAL...
Page 9: ...viii...