5
GETTING STARTED
Box 1 Getting Started card, LightBurn license & assembly components.
Box 2: Contains the bulk of the assembly components.
Box 3: Contains optional extras.
Box 4: Contains the linear rails and driver board cover.
Underneath these four packages are the Base Plate and Acrylic Panels.
Whats in the Box
Preparation
A medium size table should be enough space to construct your Emblaser Core.
Allow yourself 2-3 hours to complete the kit assembly.
Use powered drivers at your own risk!
We recommend using hand tools supplied, as some parts may be damaged by overtightening.
Running into trouble?
If you get stuck or have any questions, comments or feedback, please contact us at:
[email protected]
Summary of Contents for Emblaser Core
Page 1: ...Emblaser Core Assembly Manual Rev 1 32 User Assembly Manual English Darkly LabsR Kit Rev 1 0 ...
Page 13: ...Step 1 04 Place the 4x Cable Management Clips in the recesses on the Rear Panel 13 ...
Page 21: ...21 Step 2 06 Assemble the four Idle Pulleys ...
Page 33: ...33 33 Step 2 16 Route the Belt around the two Lower Position Idle Pulleys as shown ...
Page 35: ...35 35 Step 2 18 Route the Belt behind lower position pulley in the Gantry Carriage ...
Page 41: ...41 41 Step 2 22 Route the Belt around the two Upper Position Idle Pulleys as shown ...
Page 42: ...42 42 Step 2 23 Pass the Belt through the Gantry Carraige and around the Motor Pulley ...
Page 43: ...43 43 Step 2 24 Route the Belt behind lower position pulley in the Gantry Carriage ...
Page 52: ...Fold the Driver Board Cover as shown in the diagram Step 3 07 52 52 ...
Page 68: ...Attach the Rubber Feet to the Base Plate as shown below Step 8 03 68 68 ...
Page 76: ...Connect Workspace Camera cable to the Controller Board socket indicated Step 03 76 76 ...