16
WARNING
: Make sure the Split Port
Cover and eye shield are in place before
grinding.
(International Machines Only)
Power up machine
To turn the machine on, push the top of the
rocker switch. The machine will power up and
the grinding wheels will begin to rotate.
Sharpen
1. To make sure
the drill clears
the wheel, push
the sharpening
tube all the way
to the left
before inserting
chuck.
2. Insert the chuck
with the thickest
part of the cam
touching the
swing bearing.
3. Release sharpening tube very slowly.
4. With slight
pressure
towards the
grinding wheel,
rotate the
chuck 360
degrees,
several times in
a clockwise
direction. To
achieve an
efficient and
balanced
sharpening on
both cutting
edges, avoid stopping when the drill is in
the grind. Do not reposition your hand in
mid-sharpening wait until the drill rotates
off the wheel. Continue rotating the chuck
in 360 degree rotations until the grinding
noise is minimized to a near silence.
5. Before removing the chuck, push the
sharpening tube to the left, remove
chuck. Release sharpening tube slowly.
Drill sharpening
Summary of Contents for XT3000i
Page 1: ......
Page 3: ...2...
Page 9: ...8 XT 3000 Reference Drawing 230V Units Only...
Page 11: ...10...
Page 15: ...14...
Page 25: ...24...
Page 29: ...28...
Page 31: ...30...
Page 33: ...32 Wiring Diagram...
Page 34: ...33 Electrical Diagram...
Page 38: ...37 EXPLODED VIEW MACHINE...
Page 39: ...38 EXPLODED VIEW SHARPENING FIXTURE 118 150...
Page 40: ...39 EXPLODED VIEW ALIGNMENT ASSEMBLY...
Page 43: ...43 Large Drill Attachment...
Page 45: ...45 XY Table Attachment X Y Table No Sub Assemblies Send in for Repair...
Page 46: ...46...
Page 49: ...49 Countersink Attachment...
Page 55: ...55 Step Drill Attachment...