Page 31 of 43
Mark the location
of this hole and
drill
Direct this part of
the downtube
toward the centre
of the examination
area
Once the downtube has been cut to length it will be necessary to de-burr
the end of the pipe, we also recommend doing this to the inner and outer
edges of the safety bolt’s drill hole as this will prevent damage to the cable.
Before drilling the safety bolts hole, please direct spigot on the bottom the
downtube toward the centre of the examination area to allow the best range of
motion over the examination area.
With the downtube directed it should be loosely fitted between the two metal clasps
and then holes should be marked on the tube for where the safety bolt will go
through; then remove the downtube and secure for drilling. A 7mm hole should be
drilled through the downtube on both sides to allow the bolt to pass through.
Summary of Contents for X340
Page 1: ...X340 LED Examination Light Operating Installation Manual QAM X340 0519 9...
Page 2: ...Page 1 of 43...
Page 11: ...Page 10 of 43 X340LE4...
Page 43: ...Page 42 of 43 Service Notes...
Page 44: ...Page 43 of 43...
Page 45: ...Page 44 of 43...
Page 46: ...Page 45 of 43...
Page 47: ...Page 46 of 43...