Page 29 of 43
Cable from the top
of the downtube
should be inserted
here
Mains Power
should be
inserted here
Pre-installed
Transformer is
fitted here and
should not
require any work
Fuse Holder
–
1 Amp Fuse - CS6144
4.6.5 Wiring and transformer layout
Before working on electrical connections please make sure that the
power to the light is switched off at the source and secured so that it
will not be turned on during your work.
Ideally the cable used to power the light should be of a 1.5mm twin and earth type.
DARAY recommends that the power supplied uses an earthed switched fused spur,
protected with a 3amp fuse.
The above wiring is for modern wiring applications (post 2000). On completion of the
wiring, the next process is to determine the length of the downtube.
Take the cable from the downtube and attach the wires to the choc block in the
following layout.
The cabling leading to the transformer is black and should already be attached. To
connect the cabling from the transformer into the main power we recommend you
use an earthed switched fused spur.
The wiring should be as follows:
Live terminal
brown wire.
Neutral terminal
blue wire.
Earth terminal
green/yellow wire.
Summary of Contents for X340
Page 1: ...X340 LED Examination Light Operating Installation Manual QAM X340 0519 9...
Page 2: ...Page 1 of 43...
Page 11: ...Page 10 of 43 X340LE4...
Page 43: ...Page 42 of 43 Service Notes...
Page 44: ...Page 43 of 43...
Page 45: ...Page 44 of 43...
Page 46: ...Page 45 of 43...
Page 47: ...Page 46 of 43...