Page 14 of 43
Fig.14
The light can now be plugged in and tested. Insert the power cable into the base of the light,
switch on the power, you will see an LED indicator on the base. Once powered, use the
control panel on the side of the light head to test the on/off function and the intensity
control (see page 8 for instructions). Check that all lights illuminate (see fig.15).
Fig.15
Check the arm and head for smooth and correct movement. If the head is drifting, or if the
movement of the arm is stiff, use a hex tool to adjust the tensions detailed in maintenance
section of this manual. Your new DARAY light is now ready for use.
To gain full support of our warranty please fill in the warranty details online at
http://www.daray.co.uk/docs/warranty.php
NOTE: The mains power supply should meet IEC60245-1 requirements.
Summary of Contents for SL730 Series
Page 1: ...SL730 LED Minor Surgery Light Operating Installation Manual QAM SL730 0119 13...
Page 2: ...Page 1 of 43...
Page 44: ...Page 43 of 43 Service Notes...
Page 45: ...Page 44 of 43...
Page 46: ...Page 45 of 43...
Page 47: ...Page 46 of 43...