![DARAY SL730 Series Operating & Installation Manual Download Page 30](http://html1.mh-extra.com/html/daray/sl730-series/sl730-series_operating-and-installation-manual_510262030.webp)
Page 29 of 43
4.4.4 Wiring and transformer layout
The last aspect of fitting is to attach the wall mount cover.
If previously disconnected re-attach the power lead to the transformer through the mains
input Molex connection. Then, work the cover over the wall plate ensuring you do not catch
the cabling. Once flush with the wall mount you will need to lock the cover in place using
screws that will locate around the edges of the cover.
Fig.4
Supply power to the mains connection and power the light on using the button located on the
lighthead. Check that all LED’s illuminate.
The light can now be tested by applying power and checking the arms and head for smooth &
correct movement. If the head is drifting, or if the movement of the arm is stiff, use a hex tool
to adjust the tensions detailed in maintenance section of this manual. Your new Daray light is now
ready for use.
4.4.5 Primary rotation arm installation
This wall system will have the primary rotation pre-installed into the wall plate /
arm boss system and will not require any additional installation.
Fig.5
Mains input
Molex
Screw Points
Summary of Contents for SL730 Series
Page 1: ...SL730 LED Minor Surgery Light Operating Installation Manual QAM SL730 0119 13...
Page 2: ...Page 1 of 43...
Page 44: ...Page 43 of 43 Service Notes...
Page 45: ...Page 44 of 43...
Page 46: ...Page 45 of 43...
Page 47: ...Page 46 of 43...