![Dannmar D2-12C Installation And Operation Manual Download Page 32](http://html1.mh-extra.com/html/dannmar/d2-12c/d2-12c_installation-and-operation-manual_3434364032.webp)
32
• Always
replace ALL FAULTY PARTS before lift is put
back into operation.
• Daily:
Make a visual inspection of ALL MOVING
PARTS and check for excessive signs of wear.
• Daily:
Check safety locks to ensure they are in good
operating condition.
• Daily: Check cables and sheaves for wear. Replace
worn parts as required with genuine BendPak parts.
• Daily: Inspect adapters for damage or excessive
wear. Replace as required with genuine BendPak
parts.
• Weekly: Lubricate all sheave and rollers with general
purpose oil.
• Weekly: Check all cable connections, bolts and pins
to ensure proper mounting.
• Monthly: Check equalizer cable tension. Adjust per lift
installation instructions.
• Monthly: Lubricate locking latch shafts. Push latch
handle several times for oil to penetrate pivot points.
• Every 3 Months: Check anchor bolt torque. Anchors
should be torqued to 90 ft/lbs.
• Semi-Annually: Check fluid level of lift power unit and
refill if required per lift installation instructions.
• Replace all caution, warning or safety related decals
on the lift if unable to read or missing. Reorder labels
from BendPak.
• Refer to ANSI/ALI ALOIM booklet for periodic
inspection checklist and maintenance log sheet.
LIFT OPERATION SAFETY (CONT’D)
Before lifting the vehicle, make sure it is neither front nor rear heavy. See image below.
Center of balance should be midway between adapters.
Summary of Contents for D2-12C
Page 13: ...13 HOSE ROUTING Side of Column...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42 42...
Page 43: ...43 43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...
Page 48: ...48...