![Dannmar D2-12C Installation And Operation Manual Download Page 12](http://html1.mh-extra.com/html/dannmar/d2-12c/d2-12c_installation-and-operation-manual_3434364012.webp)
12
6. Route both Hoses in their respective Columns
PRIOR
to standing up the Columns. When routing the Hydraulic
Hose through the Columns, make sure to route through
the Retaining Clips welded inside each Column. Make
sure that the Hose is clear of any moving parts. It may be
necessary to tie Hose clear of obstructions by using nylon
tie straps or wire. Refer to Step 10.
BE SURE TO ROUTE THE HYDRAULIC HOSES
THROUGH THE RETAINING CLIPS WELDED
INSIDE EACH COLUMN.
Fig 3.7
EQUALIZER CABLE ROUTING
M10
Spring
Lock
Washer
Fig 3.6
M10 Hex
Head Bolt
M10 Flat
Washer
M10 Hex
Nut
CABLE
THREADED
END
BUTTON
END
Summary of Contents for D2-12C
Page 13: ...13 HOSE ROUTING Side of Column...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42 42...
Page 43: ...43 43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...
Page 48: ...48...