11
STEP 3
(Column Preparation)
COMPLETE THE FOLLOWING
PRIOR TO STANDING UP COLUMNS.
1. Slide Lift Head up Column to access the Cable
Sheave and Equalizer Cable routing. (See Fig 3.1)
2. Temporarily remove the Cable Sheaves located at
the inside bottom of each Column. (Fig. 3.2)
3. Route the Button End of Cable around the Bottom
Sheave and secure at the carriage lock plate inside each
Lift Head. Route the Threaded End of Cable up through the
bottom of the carriage. Leave extra cable resting on top of
carriage until further steps are required. (See Fig 3.3 and 3.4)
4.
Install the Straight and Elbow Cylinder Fittings in
Cylinder Ports. Make sure the Elbow Fittings point towards
the side of the Column that the hose retainer clips are
located on. (See Fig 3.5)
Fig 3.1
Slide Lift
Head upwards
Fig 3.2
Remove cable
sheaves
Threaded end of
cable routed up
through carriage
towards Overhead
Assembly mounting.
Fig 3.3
NOTE: Portions of Carriage and Column not shown for clarity
NOTE: Column hidden for clarity
Powerside
Column shown.
Fig 3.4
Threaded Cable
end from other
side of lift.
Cable routed up
and across Over-
head Assembly to
opposite carriage.
Fig 3.5
Elbow Fitting must
point towards hose
clips for hydraulic
hose routing
Notice that
the hose clips
are offset for
Hydraulic Hose
routing
NOTE
FIT EXTENSION WELDMENTS TO POST ASSEMBLY
IN THIS STEP FOR EASE OF INSTALLATION
AND BOLT TOGETHER AS SHOWN ON PAGE 13
WITH M10 HARDWARE.
Summary of Contents for D2-12C
Page 13: ...13 HOSE ROUTING Side of Column...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42 42...
Page 43: ...43 43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...
Page 48: ...48...