![Dannmar D2-12C Installation And Operation Manual Download Page 18](http://html1.mh-extra.com/html/dannmar/d2-12c/d2-12c_installation-and-operation-manual_3434364018.webp)
18
ENSURE THAT BOTH THE POWER SIDE & OFF
SIDE SAFETIES ENGAGE PROPERLY PRIOR TO
LIFT OPERATION.
Fig 9.3
Slip looped end
over bottom pin
Insert non-looped
end of safety
cable through
hole in Column
Fig 9.4
Route safety cable
under Off Side
safety sheave and up
towards Overhead
Assembly
NOTE: Column cut away for clarity
Fig 9.5
Safety
Cable
NOTE: Top plate cut away for clarity
Route safety
cable over the top
pin of the Power
Side Safety
Weldment
Tighten jam
nuts ensuring
safety cable is
centered in hole
Route safety
cable the
hole in the
threaded pin
NOTE:
M
AKE SURE TO KEEP THE SAFETY CABLE
CENTERED WHEN TIGHTENING JAM NUTS
ON SAFETY.
Fig 9.6
Summary of Contents for D2-12C
Page 13: ...13 HOSE ROUTING Side of Column...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42 42...
Page 43: ...43 43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...
Page 48: ...48...