4.7.2 Attaching the E1h/E2h to the Pedestal
1.
Lift the drive and position it on the pedestal.
There are 2 bolts in the rear of the pedestal that
slide into the 2 slotted holes in the rear of the
enclosure. Position the drive by adjusting the
bolts up or down. Loosely secure with 2 M10 nuts
and locking brackets. See
2.
Verify that there is 225 mm (9 in) top clearance
for air exhaust.
3.
Verify that the air intake at the bottom front of
the unit is not obstructed.
4.
Around the top of the pedestal, secure the
enclosure using 6 M10x30 fasteners. Refer to
. Loosely tighten each bolt until all
bolts are installed.
5.
Fasten each bolt securely and torque to 19 Nm
(169 in-lb).
6.
Torque the 2 M10 nuts at the rear of the
enclosure to 19 Nm (169 in-lb).
130
BF225.10
1
2
5
4
6
3
1
Enclosure
4 Slotted hole in enclosure
2
Pedestal
5 Bolt at rear of pedestal
3
M10 nut
6 Locking bracket
Illustration 4.4 Pedestal to Enclosure Back Mounting Points
130
BF207.10
1
2
3
1
Enclosure
3 M10x30 fasteners
(rear corner bolts not
shown)
2
Pedestal
– –
Illustration 4.5 Pedestal to Enclosure Mounting Points
4.7.3 Creating Cable Openings
The gland plate is a sheet of metal with studs along the
outer edge. The gland plate provides cable entry and cable
termination points, and must be installed to maintain the
IP21/IP54 (Type 1/Type 12) protection rating. The plate is
placed between the drive enclosure and the pedestal.
Depending on stud orientation, the plate can be installed
from inside the enclosure or the pedestal. For gland plate
dimensions, see
chapter 9.8.1 E1h Exterior Dimensions
Refer to
for the following steps.
1.
Create cable entry holes in the gland plate using
a sheet metal punch.
2.
Insert the gland plate using 1 of the following
methods:
2a
To insert the gland plate through the
pedestal, slide the gland plate through
the slot (4) in the front of the pedestal.
2b
To insert the gland plate through the
enclosure, angle the gland plate until it
can be slid under the slotted brackets.
3.
Align the studs on the gland plate to the holes in
the pedestal and secure with 10 M5 nuts (2).
4.
Torque each nut to 2.3 Nm (20 in-lb).
Mechanical Installation
Operating Guide
MG16P222
Danfoss A/S © 04/2018 All rights reserved.
17
4
4