17. Start engine, checking to be certain pump remains in neutral. Run engine at normal operating speed
and carefully check for forward and reverse control operation.
18. Continue to cycle between forward and reverse for at least five minutes to bleed all air and flush
system contaminants out of the system loop.
Normal charge pressure fluctuation may occur during forward and reverse operation.
19. Check that the reservoir is full and remove charge pressure gauge.
The pump is now ready for an operation.
Service Manual
H1T 045/053, 060/068 Axial Piston Tandem Pumps
Initial Startup Procedures
34 |
©
Danfoss | September 2020
AX152886481761en-000405