Plant and
Group
Inverter
Overall plant status
-
x
Red:
Plant PR <50%, or:
Any inverter in the network
- in
fail safe
mode, or
- missing from the scan list, no contact with the master
Yellow:
Any inverter in the network
- with PR <70%, or
- in
Connecting
or
Off grid
mode
Green:
Plant PR ≥70%, and
- all inverters with PR ≥70%, and
- all inverters in
On grid
mode
x
Red:
Inverter PR <50%, or inverter has an error
Yellow:
Inverter PR between 51% and 70%, or inverter in
Connecting
mode
Green:
No errors, and
- inverter PR ≥70%, and
- inverter in
On grid
mode
Current production
kW
x
x
Real time energy production level
Yield today
kWh
x
x
Cumulative yield for the day
Total revenue
Euro
x
x
Cumulative revenue earned since initial startup
Total CO
2
saving
kg
x
x
Cumulative CO
2
saved since initial startup
Performance ratio
%
x
x
Real time performance ratio
Total yield
kWh
x
x
Cumulative yield since initial startup
Power limit adjustment
%
x
Maximum power limit as % of nominal inverter AC output rating
Table 3.3 Information Displayed in Plant View, Overview Screen
NOTICE
To calculate performance ratio PR, an irradiation sensor
is required, see [Setup
→
Calibration].
3.3.6 Autotest Procedure
For certain grid codes, an automatic test of the inverter
can be initialised by activating the inverter autotest
procedure:
•
Via the web interface, go to [Inverter level: Setup
→
Setup details
→
Autotest] and click on [Start
→
Test].