44
RS8GX102 © Danfoss 10-2013
AK-LM 350
Refrigerating plant example
We have decided to describe the setup by means of an example
comprising the connections shown below.
The example is the same as the one given in the "Design" section,
i.e. the controller is an AK-LM 350 + 1 extension module.
Example:
COP calculation on a CO2 booster system with heat recovery.
• Pressure readings can be retrieved from the other controllers
• Temperature readings cannot be shared
• The current connected capacity can be retrieved with a 0-10 V signal
• Register the position of three-way valves (on/off signal).
1
2