background image

5 Installation

Installation and operation manual

10

RXYLQ10~14T7Y1B*

VRV IV system air conditioner

4P543426-1 – 2018.07

▪ Transmission  line  section:  0.75~1.25  mm

2

,  maximum  length  is

1000  m.  If  the  total  transmission  wiring  exceeds  these  limits,  it
may result in communication error.

For non-standard combinations

Calculate the recommended fuse capacity.

Formula

Calculate, by adding the minimum circuit amps of each
used unit (according to the table above), multiply the
result by 1.1 and select the next higher recommended
fuse capacity.

Example

Combining the RXYLQ18 by using the RXMLQ8 and
the RXYLQ10.

▪ Minimum circuit ampacity of the RXMLQ8=16.1 A

▪ Minimum circuit ampacity of the RXYLQ10=22.0 A

Accordingly, the minimum circuit ampacity of the
RXYLQ18=16.1 A+22.0 A=38.1 A

Multiply the above result by 1.1 

 (38.1 A×1.1)=

41,91 A, so the recommended fuse capacity would be

45 A

.

NOTICE

When  using  residual  current  operated  circuit  breakers,  be
sure  to  use  a  high-speed  type  300  mA  rated  residual
operating current.

5

Installation

5.1

Opening the units

5.1.1

To open the outdoor unit

DANGER: RISK OF ELECTROCUTION

DANGER: RISK OF BURNING

To gain access to the unit, front plates need to be opened as follows:

14×

Once  the  front  plates  open,  the  electrical  component  box  can  be
accessed.  See 

"5.1.2  To  open  the  electrical  component  box  of  the

outdoor unit" on page 10

.

For service purposes, the pushbuttons on the main PCB need to be
accessed.  To  access  these  pushbuttons,  the  electrical  component
box  cover  does  not  need  to  be  opened.  See 

"6.1.3  To  access  the

field setting components" on page 21

.

5.1.2

To open the electrical component box of
the outdoor unit

NOTICE

Do  NOT  apply  excessive  force  when  opening  the
electronic  component  box  cover.  Excessive  force  can
deform  the  cover,  resulting  in  entering  of  water  to  cause
equipment failure.

SW8

NOTICE

When  closing  the  electrical  component  box  cover,  make
sure that the sealing material on the lower back side of the
cover is NOT caught and bend towards the inside.

a

b
c
d

e

a

 Electrical component box cover

b

 Front side

c

 Power supply terminal block

d

 Sealing material

e

 Moisture and dirt could enter

X

 Not allowed

O

 Allowed

5.2

Mounting the outdoor unit

5.2.1

To provide the installation structure

Make  sure  the  unit  is  installed  level  on  a  sufficiently  strong  base  to
prevent vibration and noise.

NOTICE

▪ When  the  installation  height  of  the  unit  needs  to  be

increased,  do  NOT  use  stands  to  only  support  the
corners.

▪ Stands under the unit must be at least 100 mm wide.

≥100 mm

≥100 mm

*

X

Not allowed

O

Allowed (

*

 = preferred installation)

▪ The  height  of  the  foundation  must  at  least  be  150  mm  from  the

floor.  In  heavy  snowfall  areas,  this  height  should  be  increased,
depending on the installation place and condition.

Summary of Contents for VRV IV RXMLQ8T7Y1B Series

Page 1: ...Installation and operation manual VRV IV system air conditioner English Installation and operation manual VRV IV system air conditioner RXMLQ8T7Y1B RXYLQ10T7Y1B RXYLQ12T7Y1B RXYLQ14T7Y1B...

Page 2: ...18 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z vsemi spremembami Direktiivid koos muudatustega Direktyvose su papildymais Direkt v s un to papildin jumos Smernice v plat...

Page 3: ...astaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota T...

Page 4: ...onnecting the electrical wiring 18 5 7 1 Field wiring Overview 18 5 7 2 Guidelines when knocking out knockout holes 19 5 7 3 To route and fix the transmission wiring 19 5 7 4 To connect the transmissi...

Page 5: ...INDICATIONOFINSTALLATIONINFORMATION 1 RECORD OF INDOOR UNIT MODELAND INSTALLATION SITE 2 RECORD FOR SETTINGS CONTENTS SEE INSTALLATION MANUAL SETTING 40 30 10 20 19 9 29 39 38 28 8 18 17 7 27 37 36 26...

Page 6: ...ating capacities ranging from 31 5 to 45 kW and cooling capacities rating from 28 to 40 kW In multi combination the heating capacity ranges from 50 to 135 kW and cooling capacity ranges from 45 to 120...

Page 7: ...ation see About the piping length in the installer reference guide Only use phosphoric acid deoxidised seamless copper 4 2 2 To select the piping size Determine the proper size using the following tab...

Page 8: ...e adapters for the change over from inch to mm pipes field supply The additional refrigerant calculation has to be adjusted as mentioned in 5 6 3 To determine the additional refrigerant amount on page...

Page 9: ...wed O Allowed If the piping length between the outdoor units exceeds 2 m create a rise of 200 mm or more in the gas line within a length of 2 m from the kit If Then 2 m a b 2 m 2 m a 2 m 2 m 200 mm 20...

Page 10: ...ssed See 5 1 2 To open the electrical component box of the outdoor unit on page 10 For service purposes the pushbuttons on the main PCB need to be accessed To access these pushbuttons the electrical c...

Page 11: ...t holes Avoid damaging the casing After making the knockout holes we recommend you remove the burrs and paint the edges and areas around the edges using repair paint to prevent rusting When passing el...

Page 12: ...nadequate torque may cause leakage of refrigerant and breakage of the stop valve cap NOTICE Pay attention that mentioned torque range is applicable for opening 19 1 25 4 mm stop valves only To close t...

Page 13: ...Wait until all oil has dripped out before continuing with the connection of the field piping in case the recovery was not complete 5 4 Checking the refrigerant piping 5 4 1 About checking the refrige...

Page 14: ...nt piping on page 13 5 4 4 To perform a leak test The leak test must satisfy the specifications of EN378 2 To check for leaks Vacuum leak test 1 Evacuate the system from the liquid and gas piping to 1...

Page 15: ...E Close the front panel before any refrigerant charge operation is executed Without the front panel attached the unit cannot judge correctly whether it is operating properly or not NOTICE In case of m...

Page 16: ...Weight factor 15 9 mm 0 18 15 mm 0 16 16 mm 0 18 19 1 mm 0 26 18 mm 0 24 22 2 mm 0 37 22 mm 0 35 5 6 4 To charge refrigerant Flow chart For more information see 5 6 5 To charge refrigerant on page 17...

Page 17: ...t outdoor unit operation If Then The additional refrigerant amount is smaller than 10 kg Perform steps 2 3 The additional refrigerant charge is larger than 10 kg Perform steps 2 8 3 Pre charging can b...

Page 18: ...refrigerant charge operation will automatically stop within 30 minutes If charging is not completed after 30 minutes perform the additional refrigerant charging operation again 5 6 7 Checks after char...

Page 19: ...2 left b Internal transmission wiring Q1 Q2 c Plastic bracket d Field supplied clamps 5 7 4 To connect the transmission wiring The wiring from the indoor units must be connected to the F1 F2 In Out te...

Page 20: ...ting the earth wire it is recommended to perform curling Multiple outdoor units To connect the power supply for multiple outdoor units to each other ring tongues have to be used No bare cable can be u...

Page 21: ...ent display s To access you can remove the front inspection cover of the front plate see figure Now you can open the inspection cover of the electrical component box front plate see figure You can see...

Page 22: ...e selected setting s value is done by pushing BS3 1 time Now BS2 is used to select the required value of the selected setting When the required value is selected you can define the change of value by...

Page 23: ...t Deactivated 1 Activated To stop the manual additional refrigerant charge operation when the required additional refrigerant amount is charged push BS3 If this function was not aborted by pushing BS3...

Page 24: ...ts Pipe size and pipe insulation Be sure that correct pipe sizes are installed and that the insulation work is properly executed Stop valves Be sure that the stop valves are open on both liquid and ga...

Page 25: ...splay idle Completion Description Abnormal completion Indication of malfunction code on the 7 segment display Refer to 7 5 Correcting after abnormal completion of the test run on page 25 to take actio...

Page 26: ...connection on PCB or actuator Discharge temperature too high R21T R22T Stop valve closed Refrigerant shortage Open stop valves Check refrigerant amount recharge unit Compressor casing temperature too...

Page 27: ...nection Transmission outdoor unit inverter INV2 transmission trouble A1P X20A X28A X40A Check connection INV1 unbalanced power supply voltage Check if power supply is within range INV2 unbalanced powe...

Page 28: ...llowing items before retrying autocharge procedure Check if the gas side stop valve is opened correctly Check if the valve of the refrigerant cylinder is opened Check if the air inlet and outlet of th...

Page 29: ...obstacles the wall heights of sides A C have no impact on service space dimensions Refer to the figure above for impact of wall heights of sides B D on service space dimensions In case of an installat...

Page 30: ...smission wiring refer to the service manual Position in switch box English Translation Position in switch box Position in switch box Legend A1P Main PCB A2P Noise filter PCB A3P Inverter PCB A4P SUB P...

Page 31: ...se of using Hydrobox units or AHU They can be found in the installation operation manual of the dedicated unit Latest information can be found in the technical engineering data 13 2 Operating the syst...

Page 32: ...ystem does not go into operation if the room temperature is low 20 C 13 3 2 To use the dry program WITHOUT cool heat changeover remote control switch To start 1 Press the operation mode selector butto...

Page 33: ...signate one of the user interfaces as the master user interface The displays of slave user interfaces show change over under centralised control and slave user interfaces automatically follow the oper...

Page 34: ...e unit Stop the operation The operation switch does NOT work well Turn OFF the power supply Malfunction Measure If the user interface display indicates the unit number the operation lamp flashes and t...

Page 35: ...related Autocharge operation related Capacity setting malfunction outdoor Abnormal low pressure drop faulty expansion valve Reversed power supply phase malfunction INV voltage power shortage System te...

Page 36: ...l and refrigerant from remaining in the system a small amount of refrigerant is kept flowing 15 2 9 Symptom Noise of air conditioners Indoor unit outdoor unit A continuous low hissing sound is heard w...

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ...4P543426 1 2018 07 Copyright 2018 Daikin 4P543426 1 0000000M...

Reviews: