
20
3P184443-12N
English
L
N
L
N
After clamping Clamp(4)
(Small) to wire sheath,
clamp the wire sheath
with Clamp(4)(Large) to
clamp material.
Be sure to clamp wire
sheath. After securing
the clamp (4) to clamp
material, cut off any extra
material.
How to connect power supply terminal
block with ground wire (3P)
Be sure to attach it to prevent the infiltration of
water as well as any insects and other small
creatures from the outside. Otherwise a short
circuit may occur inside the control box.
Be sure to clamp
wire sheath.
After securing the
clamp (4) to clamp
material, cut off any
extra material.
Remote controller wiring
Transmission wiring
control box cover
Remote controller and transmission wiring
[(ex.) How to attach sealing materials]
(accessory)
REMOTE
CONTROL
TRANSMISSION
WIRING
FORCED
OFF
(accessory)
Clamp(4)
Clamp(4)
(Large)
(Small)
Clamp
material
Power supply
terminal block
(accessory)
Sealing material (12)
Attach
completely to
hole of wiring
without leaving
any space
Sealing
material(12)
Wiring to
outside
(accessory)
Wiring diagram label
(Back side of control box cover)
Wiring
(Inside)
(Outside)
Terminal block for
remote controller (6P)
How to connect terminal block
(6P) for remote controller and
transmission wiring
Note
3/8-9/16 in.
REMO
TE
CONTR
OL
TRANSMISSION
WIRING
FORCED
OFF
Remove the
control box cover
(take off 2
screws)
Power supply wiring
3/8-9/16 in.
Note
Note
Power supply
wiring
(accessory)
Clamp(4)
(Large)
Clamp
material
Fig. 27
Summary of Contents for VRV FXZQ07MVJU9
Page 27: ...3P184443 12N EM12A030 1303 DE...