PIM00424
5-1
Chapter 5
Start-up Procedure
Start-up Procedure are as follows.
1.
Check
・・・・・・・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 6 Confirmation of the Arrival Product”
2.
Transportation and installation
・・・・・・・・・・
Refer to “Chapter 7 Transportation and Installation”
3.
Piping
・・・・・・・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 8 Piping”
4.
Electric wiring
・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 9 Electric Wiring”
5.
Turning on the power
・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
Please make sure the following items firstly and turning on the
power.
Is it already correctly installed?
Is it already correctly plumbed?
Is the hydraulic oil injected?
Is it already correctly wired?
Is the power supply voltage correct?
6.
Flushing running
・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
7.
Oil replacement
・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
8.
Air vent
・・・・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
9.
Operation check
・・・・・・・・・・・・・・・・・・・
Please check the operation of the actuator. Please refer to “11.5
Setup mode”, change the setting value of the pressure and flow rate
Summary of Contents for Super Unit SUT00S8007-30
Page 2: ......
Page 12: ......
Page 19: ...PIM00424 3 5 3 4 Dimensions Motor Pump Type SUT00 SUT00S8007 30 ...
Page 20: ...PIM00424 3 6 SUT00D8021 30 ...
Page 21: ...PIM00424 3 7 Unit Type SUT10 SUT16 SUT10S8007 30 ...
Page 22: ...PIM00424 3 8 SUT10D8021 30 ...
Page 23: ...PIM00424 3 9 SUT16D8021 30 ...
Page 28: ......
Page 32: ......
Page 34: ......
Page 38: ......
Page 42: ......
Page 50: ......
Page 60: ......
Page 92: ......