4 Installation
Installation manual
11
RZQG71~Y1 + RZQSG100~Y1
Split system air conditioners
4P385521-1C – 2019.04
a
b
V1
Y1
c
c
c
c
d
d
e
e
f
f
a
Switch box
b
Stop valve attachment plate
c
Earth
d
Cable tie
e
Interconnection cable
f
Power supply cable
3
Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate and route the wiring
according to the illustration above.
4
Choose a knockout hole and remove the knockout hole by
tapping on the attachment points with a flat head screwdriver
and a hammer.
5
Route the wiring through the frame and connect the wiring to
the frame at the knockout hole.
Routing through
the frame
Choose one of the 3 possibilities:
a
b
a
b
a
b
2
3
1
a
Power supply cable
b
Interconnection cable
Connecting to the
frame
When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.
When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.
a b c
d
e
A B
A
Inside of the outdoor unit
B
Outside of the outdoor unit
a
Wire
b
Bush
c
Nut
d
Frame
e
Hose
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing and underlying piping.
▪ After making the knockout holes, we recommend to
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
6
Reattach the service cover.
7
Connect an earth leakage circuit breaker and fuse to the power
supply line.
4.6
Finishing the outdoor unit
installation
4.6.1
To finish the outdoor unit installation
1
Insulate and fix the refrigerant piping and interconnection cable
as follows:
f
b
a
e
d
c
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2
Install the service cover.
Summary of Contents for SkyAir RZQG140L7Y1B
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ...4P385521 1C 2019 04 Copyright 2014 Daikin 4P385521 1 B 0000000 4P385521 1 C 0000000...