4 Installation

Installation manual

11

250D7Y1B
Sky Air Advance-series
4P573384-1 – 2019.04

H2

Height difference between the highest and the lowest
indoor unit
Refrigerant branch kit

4.4.5

Charging additional refrigerant

To determine the additional refrigerant amount

To determine if adding additional refrigerant is necessary

Chargeless length

Ø standard

30 m

Ø size-up of 

gas

 piping

30 m

Ø size-up of 

liquid

 piping

20 m

If

Then

(L1+L2+L3+L4+L5+L6+L7)≤
chargeless length

You do not have to add
additional refrigerant.

(L1+L2+L3+L4+L5+L6+L7)>
chargeless length

You must add additional
refrigerant.

For future servicing, encircle the
selected amount in the tables
below.

INFORMATION

Piping length is the largest one-way length of liquid piping.

To determine the additional refrigerant amount (R in kg) (in
case of pair)

Standard piping size:

Standard piping size

L1 (m)

L1: 30~40

40~50

50~60

60~70

70~80

80~90

90~100

R:

0.45

0.9

1.35

1.8

2.25

2.7

3.15

Size-up piping size:

Size-up piping size

L1 (m)

L1:

20~25

25~30

30~35

35~40

40~45

40~45

R:

0.35

0.7

1.05

1.4

1.75

2.1

To determine the additional refrigerant amount (R in kg) (in
case of twin, triple and double twin)

1

Determine G1 and G2.

G1 (m)

Total length of <x> liquid piping

x=

Ø9.5 mm

 (standard)

x=

Ø12.7 mm

 (size‑up)

G2 (m)

Total length of 

Ø6.4

 mm liquid piping

2

Determine R1 and R2.

If

Then

G1>30 m

(a)

Use the table below to determine
R1 (length=

G1−30 m

)

(a)

 and R2

(length=

G2

).

G1≤30 m

(a)

(and G1+G2>30 m)

(a)

R1=0.0 kg.

Use the table below to determine
R2 (length=

G1+G2−30 m

)

(a)

.

(a)

In case of size‑up: replace 30 m by 20 m.

Standard liquid pipe size

Length (m)

0~10

10~20

20~30

30~40

40~50

50~60

60~70

R1:

0.45

0.9

1.35

1.8

2.25

2.7

3.15

Standard liquid pipe size

Length (m)

0~10

10~20

20~30

30~40

40~50

50~60

60~70

R2:

0.2

0.4

0.6

0.8

1

1.2

1.4

Size‑up liquid pipe size

Length (m)

0~5

5~10

10~15

15~20

20~25

25~30

R1:

0.35

0.7

1.05

1.1

1.75

2.1

R2:

0.18

0.35

0.53

0.7

0.88

1.05

3

Determine the additional refrigerant amount: R=R1+R2.

Examples

Layout

Additional refrigerant amount (R)

L2=7 m 

(Ø9.5 mm)
L3=5 m 

(Ø9.5 mm)

L1=35 m (Ø9.5 mm)

RZA200

Case: Twin, standard liquid pipe size

1 G1 Total Ø9.5

 

=> G1=35+7+5=47 m

G2 Total Ø6.4 => G2=0 m

2 Case: G1>30 m

R1 Length=G1–30 m=47–30 m=17 m 

=> R1=0.9 kg

R2 Length=G2=0 m 

=> R2=0 kg

3 R

R=R1+R2=0.9+0=0.9 kg

L2=17 m 

(Ø6.4 mm)
L3=17 m 

(Ø6.4 mm)
L4=10 m 

(Ø6.4 mm)

L1=5 m (Ø9.5 mm)

RZA200

Case: Triple, standard liquid pipe size

1 G1 Total Ø9.5 => G1=5 m

G2 Total Ø6.4 => G2=10+17+17=44 m

2 Case: G1≤30 m (and G1+G2>30 m)

R1 R1=0.0 kg

R2 Length=G1+G2–30=5+44–30=19 m 

=> R2=0.4 kg

3 R

R=R1+R2=0.0+0.4=0.4 kg

Charging refrigerant: Setup

See 

"4.3.1 Checking refrigerant piping: Setup" 

[

4

 9].

To charge additional refrigerant

WARNING

▪ Only  use  R32  as  refrigerant.  Other  substances  may

cause explosions and accidents.

▪ R32  contains  fluorinated  greenhouse  gases.  Its  global

warming  potential  (GWP)  value  is  675.  Do  NOT  vent
these gases into the atmosphere.

▪ When  charging  refrigerant,  ALWAYS  use  protective

gloves and safety glasses.

Prerequisite: 

Before charging refrigerant, make sure the refrigerant

piping is connected and checked (leak test and vacuum drying).

1

Connect  the  refrigerant  cylinder  to  both  the  service  port  of  the
gas stop valve and the service port of the liquid stop valve.

2

Charge the additional refrigerant amount.

3

Open the stop valves.

4.4.6

Completely recharging refrigerant

To determine the complete recharge amount

For the complete charging amount refer to the additional refrigerant
charge sticker mounted on the unit.

Summary of Contents for Sky Air Advance Series

Page 1: ...Installation manual Sky Air Advance series English Installation manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B...

Page 2: ...HD HU 200 1000 1000 500 HD HU A B C 200 1 300 1000 A B C E 200 1 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 250 1500 300 1500 B D E HB HU 300 1000 1000 500 HU HB HU 300 1250 1000 50...

Page 3: ...6 17 Direktiver med senere ndringer Direktiv med f retagna ndringar Direktiver med foretatte endringer Direktiivej sellaisina kuin ne ovat muutettuina v platn m zn n Smjernice kako je izmijenjeno ir n...

Page 4: ...staava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS...

Page 5: ...sioning 14 5 2 To perform a test run 15 5 3 Error codes when performing a test run 16 6 Disposal 16 7 Technical data 17 7 1 Service space Outdoor unit 17 7 2 Piping diagram Outdoor unit 17 7 3 Wiring...

Page 6: ...ance or an operating electric heater 3 1 1 Installation site requirements of the outdoor unit Mind the spacing guidelines See the Technical data chapter and the figures on the inside of the front cove...

Page 7: ...ze between the heat exchanger and the casing of the unit This might decrease the operating efficiency INFORMATION We suggest to install the optional bottom plate heater EKBPH250D7 when the unit is ins...

Page 8: ...tation of the bends NOTICE Always protect the surrounding surfaces e g wiring insulation foam from heat when brazing 6 Do the following Insulate the liquid piping a and the gas piping b Wind heat insu...

Page 9: ...copper flare 4 3 3 To perform vacuum drying To remove all moisture from the system proceed as follows 1 Check that with the vacuum pump turned off the target vacuum is maintained for at least 1 hour 4...

Page 10: ...the refrigerant This product contains fluorinated greenhouse gases Do NOT vent gases into the atmosphere Refrigerant type R32 Global warming potential GWP value 675 WARNING FLAMMABLE MATERIAL The refr...

Page 11: ...70 R1 0 45 0 9 1 35 1 8 2 25 2 7 3 15 Standard liquid pipe size Length m 0 10 10 20 20 30 30 40 40 50 50 60 60 70 R2 0 2 0 4 0 6 0 8 1 1 2 1 4 Size up liquid pipe size Length m 0 5 5 10 10 15 15 20 20...

Page 12: ...refrigerant WARNING Only use R32 as refrigerant Other substances may cause explosions and accidents R32 contains fluorinated greenhouse gases Its global warming potential GWP value is 675 Do NOT vent...

Page 13: ...18 6 A 19 9 A Voltage range 380 415 V Phase 3N Frequency 50 Hz Wire sizes Must comply with applicable legislation Interconnection cables H05VV U4G2 5 Recommended field fuse 20 A Earth leakage circuit...

Page 14: ...ck the insulation resistance of the compressor NOTICE If after installation refrigerant accumulates in the compressor the insulation resistance over the poles can drop but if it is at least 1 M then t...

Page 15: ...e lit For any other action it needs to be lit first The backlight is lit for 30 seconds when you press a button 1 Perform introductory steps Action 1 Open the liquid stop valve and gas stop valve by r...

Page 16: ...ase of three phase power supply units Note Operation will be impossible Turn OFF the power recheck the wiring and switch two of the three electrical wires L4 The air inlet or air outlet is blocked U0...

Page 17: ...m distance between the unit and the edge of obstacle E in the direction of obstacle D HU Height of the unit HB HD Height of obstacles B and D 1 Seal the bottom of the installation frame to prevent dis...

Page 18: ...d Legend Optional Optional Part n Part n Description Description A1P Printed circuit board main A2P Printed circuit board noise filter A3P Printed circuit board inverter A4P Printed circuit board fan...

Page 19: ......

Page 20: ...4P573384 1 2019 04 Copyright 2019 Daikin 4P573384 1 0000000S...

Reviews: