background image

5 Commissioning

Installation manual

14

250D7Y1B

Sky Air Advance-series

4P573384-1 – 2019.04

Routing through
the frame

Choose one of the 3 possibilities:

a

a

a

2

3

1

a

 Power supply cable

Note: 

Route the interconnection cable

together with the refrigerant piping. See

"4.6.1 To finish the outdoor unit
installation" 

[

4

 14].

Connecting to the
frame

When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.

When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.

a b c

d

e

A B

A

 Inside of the outdoor unit

B

 Outside of the outdoor unit

a

 Wire

b

 Bush

c

 Nut

d

 Frame

e

 Hose

NOTICE

Precautions when making knockout holes:

▪ Avoid damaging the casing and underlying piping.

▪ After  making  the  knockout  holes,  we  recommend  to

remove  the  burrs  and  paint  the  edges  and  areas
around the edges using repair paint to prevent rusting.

▪ When  passing  electrical  wiring  through  the  knockout

holes,  wrap  the  wiring  with  protective  tape  to  prevent
damage.

6

Reattach the service cover.

7

Connect an earth leakage circuit breaker and fuse to the power
supply line.

4.6

Finishing the outdoor unit
installation

4.6.1

To finish the outdoor unit installation

1

Insulate and fix the refrigerant piping and interconnection cable
as follows:

f

b

a

e

d

c

a

Gas pipe

b

Gas pipe insulation

c

Interconnection cable

d

Liquid pipe

e

Liquid pipe insulation

f

Finishing tape

2

Install the service cover.

4.6.2

To check the insulation resistance of the
compressor

NOTICE

If,  after  installation,  refrigerant  accumulates  in  the
compressor,  the  insulation  resistance  over  the  poles  can
drop,  but  if  it  is  at  least  1  MΩ,  then  the  unit  will  not  break
down.

▪ Use a 500 V mega-tester when measuring insulation.

▪ Do not use a mega-tester for low-voltage circuits.

1

Measure the insulation resistance over the poles.

If

Then

≥1 MΩ

Insulation resistance is OK. This procedure
is finished.

<1 MΩ

Insulation resistance is not OK. Go to the
next step.

2

Turn ON the power and leave it on for 6 hours.

Result: 

The  compressor  will  heat  up  and  evaporate  any

refrigerant in the compressor.

3

Measure the insulation resistance again.

5

Commissioning

Please  provide  the  eco  design  data  according  to  (EU)2016/2281  to
the customer. This data can be found in the installer reference guide
or via the Daikin website.

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

5.1

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

Summary of Contents for Sky Air Advance Series

Page 1: ...Installation manual Sky Air Advance series English Installation manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B...

Page 2: ...HD HU 200 1000 1000 500 HD HU A B C 200 1 300 1000 A B C E 200 1 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 250 1500 300 1500 B D E HB HU 300 1000 1000 500 HU HB HU 300 1250 1000 50...

Page 3: ...6 17 Direktiver med senere ndringer Direktiv med f retagna ndringar Direktiver med foretatte endringer Direktiivej sellaisina kuin ne ovat muutettuina v platn m zn n Smjernice kako je izmijenjeno ir n...

Page 4: ...staava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS...

Page 5: ...sioning 14 5 2 To perform a test run 15 5 3 Error codes when performing a test run 16 6 Disposal 16 7 Technical data 17 7 1 Service space Outdoor unit 17 7 2 Piping diagram Outdoor unit 17 7 3 Wiring...

Page 6: ...ance or an operating electric heater 3 1 1 Installation site requirements of the outdoor unit Mind the spacing guidelines See the Technical data chapter and the figures on the inside of the front cove...

Page 7: ...ze between the heat exchanger and the casing of the unit This might decrease the operating efficiency INFORMATION We suggest to install the optional bottom plate heater EKBPH250D7 when the unit is ins...

Page 8: ...tation of the bends NOTICE Always protect the surrounding surfaces e g wiring insulation foam from heat when brazing 6 Do the following Insulate the liquid piping a and the gas piping b Wind heat insu...

Page 9: ...copper flare 4 3 3 To perform vacuum drying To remove all moisture from the system proceed as follows 1 Check that with the vacuum pump turned off the target vacuum is maintained for at least 1 hour 4...

Page 10: ...the refrigerant This product contains fluorinated greenhouse gases Do NOT vent gases into the atmosphere Refrigerant type R32 Global warming potential GWP value 675 WARNING FLAMMABLE MATERIAL The refr...

Page 11: ...70 R1 0 45 0 9 1 35 1 8 2 25 2 7 3 15 Standard liquid pipe size Length m 0 10 10 20 20 30 30 40 40 50 50 60 60 70 R2 0 2 0 4 0 6 0 8 1 1 2 1 4 Size up liquid pipe size Length m 0 5 5 10 10 15 15 20 20...

Page 12: ...refrigerant WARNING Only use R32 as refrigerant Other substances may cause explosions and accidents R32 contains fluorinated greenhouse gases Its global warming potential GWP value is 675 Do NOT vent...

Page 13: ...18 6 A 19 9 A Voltage range 380 415 V Phase 3N Frequency 50 Hz Wire sizes Must comply with applicable legislation Interconnection cables H05VV U4G2 5 Recommended field fuse 20 A Earth leakage circuit...

Page 14: ...ck the insulation resistance of the compressor NOTICE If after installation refrigerant accumulates in the compressor the insulation resistance over the poles can drop but if it is at least 1 M then t...

Page 15: ...e lit For any other action it needs to be lit first The backlight is lit for 30 seconds when you press a button 1 Perform introductory steps Action 1 Open the liquid stop valve and gas stop valve by r...

Page 16: ...ase of three phase power supply units Note Operation will be impossible Turn OFF the power recheck the wiring and switch two of the three electrical wires L4 The air inlet or air outlet is blocked U0...

Page 17: ...m distance between the unit and the edge of obstacle E in the direction of obstacle D HU Height of the unit HB HD Height of obstacles B and D 1 Seal the bottom of the installation frame to prevent dis...

Page 18: ...d Legend Optional Optional Part n Part n Description Description A1P Printed circuit board main A2P Printed circuit board noise filter A3P Printed circuit board inverter A4P Printed circuit board fan...

Page 19: ......

Page 20: ...4P573384 1 2019 04 Copyright 2019 Daikin 4P573384 1 0000000S...

Reviews: