![background image](http://html1.mh-extra.com/html/daikin/siesta-atxm25n2v1b/siesta-atxm25n2v1b_installers-reference-manual_4701114020.webp)
9 Hand-over to the user
Installer reference guide
20
ATXM20~50+FTXM20~71N2V1B
Daikin room air conditioner
4P518023-4C – 2018.09
There are NO
damaged components
or
squeezed
pipes
on the inside of the indoor and outdoor units.
There are NO
refrigerant leaks
.
The correct pipe size is installed and the
pipes
are
properly insulated.
The
stop valves
(gas and liquid) on the outdoor unit are
fully open.
8.3
To perform a test run
Prerequisite:
Power supply MUST be in the specified range.
Prerequisite:
Test run may be performed in cooling or heating
mode.
Prerequisite:
Test run should be performed in accordance with the
operation manual of the indoor unit to make sure that all functions
and parts are working properly.
1
In cooling mode, select the lowest programmable temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.
2
When the test run is finished, set the temperature to a normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.
3
The system stops operating 3 minutes after the unit is turned
OFF.
8.3.1
To perform a test run using the user
interface
1
Press
to switch the system on.
2
Press
,
and
simultaneously.
3
Press
, select
and press
.
Result:
Test run operation will stop automatically after about
30 minutes.
4
To stop operation sooner, press
.
9
Hand-over to the user
Once the test run is finished and the unit operates properly, please
make sure the following is clear for the user:
▪ Make sure that the user has the printed documentation and ask
him/her to keep it for future reference. Inform the user that he can
find the complete documentation at the URL mentioned earlier in
this manual.
▪ Explain the user how to properly operate the system and what to
do in case of problems.
▪ Show the user what to do for the maintenance of the unit.
10
Disposal
NOTICE
Do NOT try to dismantle the system yourself: dismantling
of the system, treatment of the refrigerant, oil and other
parts MUST comply with applicable legislation. Units
MUST be treated at a specialised treatment facility for
reuse, recycling and recovery.
Summary of Contents for Siesta ATXM25N2V1B
Page 23: ......