Please charge additionally according to the following calculation.
(additional amount is R1+R2)

1.

G1: total length of 

Ø

9.5 mm liquid piping

G2: total length of 

Ø

6.4 mm liquid piping

2.a

G1>30 m
calculate length over 30 m (=G1–30 m)
Based on this length decide R1, R2 in the table

b

G1

30 m and G1+G2>30 m

calculate total length over 

30

 m (=G1+G2–30 m)

Based on this decide R2 in the table, R1=0

3.

Total additional charge amount
R=R1+R2 (kg)

Table 2: 

Length <unit: m>, additional charging of refrigerant

<unit: kg>

Example 1

1

G1=L1=35 m

G2=L2+L3=7+5=12

2

Over 

30 

 m

a

G1

30=5 m

  Ø9.5 R1=0.5 kg

b

G2=12 m 

  Ø6.4 R2=0.6 kg

3

Refrigerant charge amount=R=R1+R2=0.5+0.6=1.1 kg

Example 2

1

G1=L1=5 m

G2=L2+L3+L4=7+17+20=44

2

Over 

30 

m

a

G1=5 m

 R1=0.0 kg

b

(G1+G2)

30=(5+44)

30=19

 Ø6.4 R2=0.6 kg

3

Refrigerant charge amount=R=R1+R2=0.0+0.6=0.6 kg

Total charging weight of the refrigerant (after a leak, 
etc.)

The total charging amounts relate to the refrigerant piping length as
in 

"Maximum allowable piping length"

 of the table in paragraph

"Allowable pipe length and height difference" on page 6

. (E.g. twin:

L1+L2).

Table 3: 

Total charging amount <unit: kg>

Precaution for pumping-down operation

The outdoor unit is equipped with a low pressure switch or a low
pressure sensor to protect the compressor.

Take the following steps to perform the pumping-down operation.

Preliminary measures

Make sure to cut off power supply.
Open the front panel and cover the PCB and terminal board
with insulation sheet to avoid electric shock by accidental
touching of live parts.

Close the front panel before leaving the outdoor unit. You
cannot leave the unit unattended in case the front panel
remains opened.

Turn on the power supply and carry out pumping-down
operation according to the following procedure.

Pump down operation

(a)

 If after finishing pumping-down operation the outdoor unit does not operate, not 

even when the remote controller switch is turned on, the remote controller may or 
may not indicate 

"

U4

"

. But this is not a malfunction.

After finishing the pumping-down operation, make sure to
have removed the insulation sheet that was placed in the
switch box as a protective measure like in chapter

"Preliminary measures" on page 10

.

When in need of operation, turn off the main power supply
and turn it on again. Make sure that stop valves both on
liquid and gas side are open and be sure to operate the
unit in cooling operation during test run.

Liquid piping

Ø

Length exceeding "Chargeless length"

0~10

10~20

Main

9.5

0.5

1.0

R1

Branch

Branch

6.4

0.3

0.6

R2

L2=7 (Ø6.4)

50 type

100 type

L1=35 (Ø9.5)

indoor

L3=5 (Ø6.4)

50 type

outdoor heat pump

L2=7 (Ø6.4)

50 type

indoor

125 type

L1=5 (Ø9.5)

L3=17 (Ø6.4)

50 type

outdoor heat pump

indoor

L4=20 (Ø6.4)

50 type

In case of complete recharge of the refrigerant, please first
execute vacuuming. Execute this vacuuming from the
service port. Do not use the port of the stop valve for
vacuuming. Vacuuming can not be executed completely
using such port.

Position of service port:

Outdoor units have 1 service port, located between
the heat exchanger and the 4-way valve.

Refrigerant piping length

Model

Liquid pipe 

size

5~10 m

10~20 m

20~30 m

30~40 m

40~50 m

RZQSG71

standard

1.75

2.25

2.75

RZQS71

standard

1.75

2.25

2.75

RZQS100~140

standard

2.70

3.20

3.70

4.20

4.70

Never short-circuit the low pressure switch or low pressure
sensor during pump-down operation.

Procedure

Precaution

1

Make sure that stop valves both 
on liquid and on gas side are 
open.

2

Push the BS4 pumping-down 
operation button on the PC 
board of the outdoor unit 
(±8 seconds).

Compressor and outdoor fan will 
start operation automatically.
The indoor unit fan may 
automatically start running.
Please pay attention to this.

3

Close the stop valve on the 
liquid side securely about 2 
minutes after the compressor 
started operation. (See 

"How to 

use the stop valve" on page 7

)

Never leave the outdoor unit 
unattended with opened front 
panel when power supply is on.
In case the stop valve on the 
liquid side is not securely closed 
during compressor operation, 
pumping-down operation cannot 
be executed.

4

Once compressor operation 
stops after 2 to 5 minutes

(a)

close the stop valve on the gas 
side securely. (See 

"How to use 

the stop valve" on page 7

)

5

Turn off the power supply.

Summary of Contents for RZQSG71L3V1B

Page 1: ...INSTALLATION MANUAL RZQSG71L3V1B RZQS71D7V1B RZQS71D2V1B RZQS100D7V1B RZQS125D7V1B RZQS140D7V1B Split System air conditioners...

Page 2: ...6 6 8 3 3 1 3 2 4 5 A B A E B C D H H1 L1 H1 H2 L3 L1 L2 H1 H2 L4 L1 L3 L2 H1 H2 L7 L1 L6 L5 L4 L3 L2 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2 B2 B2...

Page 3: ...omo se establece en A y es valorado positivamente por B de acuerdo con el Certi cado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certi cato C 07 A B C 08 Nota tal como estabele...

Page 4: ...al como estabelecido em A e com o parecer positivo de B de acordo com o Certi cado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certi kat C 11 Information enligt A och g...

Page 5: ...pment Make certain that all electrical work is carried out by quali ed personnel according to the local laws and regulations and this installation manual using a separate circuit Insuf cient capacity...

Page 6: ...ine vapour is present This appliance is intended to be used by expert or trained users in shops in light industry and on farms or for commercial use by lay persons Sound level is less than 70 dB A Pro...

Page 7: ...to rise of high pressure When a strong wind blows continuously on the face of the unit the fan can start rotating very fast until it breaks Refer to the gures for installation of this unit in a place...

Page 8: ...piping using a drain socket optional Make sure the drain works properly INSTALLATION SERVICING SPACE The numerical gures used in here represent the dimensions for the 71 100 125 140 class models Figur...

Page 9: ...L4 L7 for double twin These pipe sizes must have the same size as the connected indoor units pipe sizes Branch see marking on gures 3 4 and 5 Selection of branch pipe L A L H 0 L 1 2H 150 250 1 2H L...

Page 10: ...or vertically Length of branch pipe to the indoor unit should be as short as possible Try to keep lengths of both branch pipes to the indoor unit equal REFRIGERANT PIPING Field pipes can be installed...

Page 11: ...now closed Cautions for handling the valve cover The valve cover is sealed where indicated by the arrow Refer to the gure Take care not to damage it After operating the valve be sure to tighten the v...

Page 12: ...easing nitrogen into the piping will create large quantities of oxidised lm on the inside of the pipes adversely affecting valves and compressors in the refrigerating system and preventing normal oper...

Page 13: ...frigerant unit kg 1 Use a 2 stage vacuum pump with a non return valve which can evacuate to 100 7 kPa 5 Torr 755 mm Hg Evacuate the system from the liquid and gas pipes by using a vacuum pump for more...

Page 14: ...t a malfunction After nishing the pumping down operation make sure to have removed the insulation sheet that was placed in the switch box as a protective measure like in chapter Preliminary measures o...

Page 15: ...Secure the ground wire to the stop valve attachment plate one more time along with the electric wiring and the inter unit wiring Lay the electrical wiring so that the front cover does not rise up whe...

Page 16: ...2 Cut out section 3 Cup washer RZQSG71 RZQS71 RZQS100 RZQS125 RZQS140 Minimum circuit amps MCA a a Stated values are maximum values see electrical data of combination with indoor units for exact value...

Page 17: ...panel with infra red receiver rst 5 In case the panels of indoor units are not yet installed to the indoor units make sure to shut off the power supply after nishing the complete test run 6 A complete...

Page 18: ...4T Thermistor coil R5T Thermistor coil middle R6T Thermistor liquid R10T Thermistor n RC Signal receiver circuit S1NPH Pressure sensor high S1PH Pressure switch high TC Signal transmission circuit V1R...

Page 19: ......

Page 20: ...4P342104 1 Copyright 2013 Daikin...

Reviews: