Installation manual
11
RZQ71~12 RZQ100~140B8W1B
Split System air conditioners
4PW23691-1A
Total charging weight of the refrigerant (after a leak,
etc.)
■
The total charging amounts relate to the refrigerant piping length
as in
"Maximum allowable piping length"
paragraph
"Allowable pipe length and height difference" on
. (E.g. twin: L1+L2).
Table 3: Total charging amount <unit: kg>
Precaution for pumping-down operation
The outdoor unit is equipped with a low pressure switch or a low
pressure sensor to protect the compressor.
Take the following steps to perform the pumping-down operation.
■
Preliminary measures
•
Make sure to cut off power supply.
Open the front panel and cover the PCB and terminal board with
insulation sheet to avoid electric shock by accidental touching of
live parts.
•
Close the front panel before leaving the outdoor unit. You cannot
leave the unit unattended in case the front panel remains opened.
•
Turn on the power supply and carry out pumping-down operation
according to the following procedure.
■
Pump down operation
(a) If after finishing pumping-down operation the outdoor unit does
not operate, not even when the remote controller switch is turned on,
the remote controller may or may not indicate “
U4
”. But this is not a
malfunction.
•
After finishing the pumping-down operation, make sure to have
removed the insulation sheet that was placed in the switch box as
a protective measure like in chapter
•
When in need of operation, turn off the main power supply and
turn it on again. Make sure that stop valves both on liquid and gas
side are open and be sure to operate the unit in cooling operation
during test run.
E
LECTRICAL
WIRING
WORK
Precautions on electrical wiring work
■
Before obtaining access to terminal devices, all supply circuits
must be interrupted.
■
Use only copper wires.
■
The wiring between the indoor unit and outdoor unit must be for
230 V.
■
Do not turn on the main switch until all the wiring is completed.
Make sure that the main switch has a contact separation of at
least 3 mm in all poles.
■
For W1
Make sure to connect power supply cables in normal phase. If
connected in reverse phase, the remote controller of the indoor
unit indicates “
U1
” and the equipment cannot operate. Change
any two of the three power supply cables (L1, L2, L3) to correct
phase.
If the contact in the magnetic switch should be forcibly turned on
while the equipment is inoperative, the compressor will burn out.
Never try to forcibly turn on the contact.
■
Never squeeze bundled cables into a unit.
■
Fix cables so that cables do not make contact with the pipes
(especially on high pressure side).
■
Secure the electrical wiring with clamping material as shown in
the figure below so that it does not come in contact with the
piping, particulary on the high-pressure side.
Make sure no external pressure is applied to the terminal
connectors.
■
When installing the earth leakage breaker make sure that it is
compatible with the inverter (resistant to high frequency
electrical noise) to avoid unnecessary opening of the earth
leakage breaker.
■
As this unit is equipped with an inverter, installing a phase
advancing capacitor not only will deteriorate power factor
improvement effect, but also may cause capacitor abnormal
heating accident due to high-frequency waves. Therefore, never
install a phase advancing capacitor.
Secure the wiring in the order shown below.
1
Secure the ground wire to the shut-off valve attachment plate so
that it does not slide.
2
Secure the ground wire to the shut-off valve attachment plate
one more time along with the electric wiring and the inter-unit
wiring.
Refrigerant piping length
Model
Liquid pipe
size
3~5
m
5~10 m
10~20 m
20~30 m
30~40 m
40~50 m
50~60 m
60~75 m
RZQ71
size-down
1.8
1.8
—
standard
1.8
1.8
2.3
2.8
3.3
3.8
—
RZQ100~140
size-down
3.3
3.3
—
standard
3.3
3.3
3.8
4.3
4.8
5.3
5.8
6.3
Refrigerant piping length
Model
Liquid pipe
size
3~5
(a)
m
(a) When piping length is less than 5 m, a complete recharging of the unit is required.
Charge the unit with the refrigerant charge as indicated.
5~10 m
10~15 m
15~20 m
20~25 m
25~30 m
30~35 m
RZQ71
size-up
2.3
2.3
2.8
3.3
3.8
—
RZQ100~140
3.8
3.8
4.3
4.8
5.3
5.8
6.3
Never short-circuit the low pressure switch or low pressure
sensor during pump-down operation.
Procedure
Precaution
1
Make sure that stop valves both on
liquid and on gas side are open.
—
2
Push the pumping-down operation
button on the PC board of the
outdoor unit.
Compressor and outdoor fan will
start operation automatically.
The indoor unit fan may
automatically start running.
Please pay attention to this.
3
Once operation stops after 3 or 5
minutes
(a)
, close the stop valve on
the liquid side and gas side
securely. (See
Never leave the outdoor unit
unattended with opened front
panel when power supply is on.
4
Turn off the power supply.
■
All wiring must be performed by an authorized
electrician.
■
All components procured on the site and all electric
construction should comply with the applicable local
and national codes.
■
High voltage
To avoid electrical shock, make sure to disconnect the
power supply 1 minute or more before servicing the
electrical parts. Even after 1 minute, always measure
the voltage at the terminals of main circuit capacitors
or electrical parts and, before touching, make sure
that those voltages are 50 V DC or less.
To persons in charge of electrical wiring work:
Do not operate the unit until the refrigerant piping is
complete. (Running it before the piping is ready will break
the compressor.)