Flaring the Pipe End

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing down-

ward so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

WARNING

1) Do not use mineral oil on flared part.
2) Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
3) Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
4) Do never install a drier to this R410A unit in order to guarantee its lifetime.
5) The drying material may dissolve and damage the system.
6) Incomplete flaring may cause refrigerant gas leakage.

4.

Refrigerant Piping

1) Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand.  Then tighten them fully with the torque 

wrenches.
• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and escaping gas.

2) To prevent gas leakage, apply refrigeration machine oil on both inner and outer surfaces of the flare. (Use refrigeration oil 

for R410A)

(Cut exactly at 

right angles.)

 Remove burrs

Set exactly at the position shown below.

A

Flaring

Die

Check

Flare’s inner 
surface must 
be flaw-free.

The pipe end must 
be evenly flared in 
a perfect circle.

Make sure that the 
flare nut is fitted.

A

0 ~ 0.5mm

Clutch-type

Flare tool for R410A

1.0 ~ 1.5mm

Clutch-type (Rigid-type)

1.5 ~ 2.0mm

Wing-nut type (Imperial-type)

Conventional flare tool

Coat here with refrigeration machine oil 

Torque wrench

Piping union

Flare nut

Spanner

Flare nut tightening torque

 

Gas side

Liquid side

 

1/2 inch

5/8 inch

1/4 inch

 49.5~60.3N 

• m

61.8~75.4N • m

14.2~17.2N • m

 

(505~615kgf • cm)

(630~770kgf • cm)

(144~175kgf • cm)

Valve cap tightening torque

 

Gas side

Liquid side

 

1/2 inch

5/8 inch

1/4 inch

 48.1~59.7N 

• m

44.1~53.9N • m

21.6~27.4N • m

 

(490~610kgf • cm)

(450~550kgf • cm)

(220~280kgf • cm)

Service port cap tightening torque

10.8~14.7N • m

(110~150kgf • cm)

01_EN_3P159684-2F.fm  Page 5  Wednesday, December 7, 2005  3:18 PM

Summary of Contents for RXS50E2V1B

Page 1: ...rlands Espa ol Italiano Portugues T rk e English Montaj k lavuzlar R410A Split serisi Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie spl...

Page 2: ...n TCF 020 95951 KRQ ECMC99 4476 Daikin TCF 020 95951 KRQ ECMC99 4476 Daikin TCF 020 95951 KRQ ECMC99 4476 Daikin TCF 020 95951 KRQ ECMC99 4476 Daikin TCF 020 95951 KRQ ECMC99 4476 Daikin TCF 020 95951...

Page 3: ...cause terminal overheating electrical shock or fire If any refrigerant has leaked out during the installation work ventilate the room The refrigerant produces a toxic gas if exposed to flames After al...

Page 4: ...n if they are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9...

Page 5: ...centres 330m m Allow space for piping and electrical servicing 250mm from wall CAUTION Set the piping length from 1 5m to 30m Wrap the insulation pipe with the finishing tape from bottom to top Stop...

Page 6: ...om the foundation surface Outdoor Unit Installation 1 Installing Outdoor Unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawi...

Page 7: ...enches Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and escaping gas 2 To prevent gas leakage apply refrigeration machine oil on both inner and outer surfaces...

Page 8: ...gauge manifold to gas shut off valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no ope...

Page 9: ...aterial Polyethylene foam Heat transfer rate 0 041 to 0 052W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C max Choose heat insulation materials that will withstan...

Page 10: ...residence or office the space where there is a human 1 You can expand the operation range to 15 C by turning on switch B SW4 on the PCB If the outdoor temperature falls to 20 C or lower the operation...

Page 11: ...rews Observe the notes mentioned following when wiring to the power supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power s...

Page 12: ...el 26 C to 28 C 3 For protection the unit disables restart operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the Operation Manual to ensure that all fu...

Page 13: ...0601 HT 3P159684 2F M05B071A...

Reviews: