11 Troubleshooting

Installation manual

13

RXA-A9, RXM-R9, ARXM-R9
R32 Split system air conditioners
3P650253-1S – 2022.11

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

10.2

Checklist during commissioning

To perform an 

air purge

.

To perform a 

test run

.

10.3

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

INFORMATION

▪ Even if the unit is turned OFF, it consumes electricity.

▪ When the power turns back on after a power break, the

previously selected mode will be resumed.

11

Troubleshooting

11.1

Fault diagnosis using LED on
outdoor unit PCB

LED is…

Diagnosis

flashing

Normal.

▪ Check the indoor unit.

ON

▪ Turn  the  power  OFF  and  back  ON,  and

check  the  LED  within  approximately  3
minutes.
If  the  LED  is  ON  again,  the  outdoor  unit
PCB is faulty.

OFF

1

Supply voltage (for power saving).

2

Power supply fault.

3

Turn  the  power  OFF  and  back  ON,  and
check  the  LED  within  approximately  3
minutes.

If the LED is OFF again, the outdoor unit
PCB is faulty.

DANGER: RISK OF ELECTROCUTION

▪ When the unit is NOT operating, the LEDs on the PCB

are turned OFF in order to save power.

▪ Even  when  the  LEDs  are  OFF,  the  terminal  block  and

the PCB may be powered.

12

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

13

Technical data

▪ A 

subset

  of  the  latest  technical  data  is  available  on  the  regional

Daikin website (publicly accessible).

▪ The 

full  set

  of  latest  technical  data  is  available  on  the  Daikin

Business Portal (authentication required).

13.1

Wiring diagram

The wiring diagram is delivered with the unit, located inside of
the outdoor unit (bottom side of the top plate).

13.1.1

Unified wiring diagram legend

For applied parts and numbering, refer to the wiring diagram on the
unit.  Part  numbering  is  by  Arabic  numbers  in  ascending  order  for
each part and is represented in the overview below by "*" in the part
code.

Symbol

Meaning

Symbol Meaning

Circuit breaker

Protective earth

Connection

Protective earth (screw)

,

Connector

A

Rectifier

Earth

Relay connector

Field wiring

Short-circuit connector

Fuse

Terminal

INDOOR

Indoor unit

Terminal strip

OUTDOOR

Outdoor unit

Wire clamp

Residual current
device

Symbol

Colour

Symbol

Colour

BLK

Black

ORG

Orange

BLU

Blue

PNK

Pink

BRN

Brown

PRP, PPL

Purple

GRN

Green

RED

Red

GRY

Grey

WHT

White

SKY BLU Sky blue

YLW

Yellow

Symbol

Meaning

A*P

Printed circuit board

BS*

Pushbutton ON/OFF, operation
switch

BZ, H*O

Buzzer

C*

Capacitor

Summary of Contents for RXA20A5V1B9

Page 1: ...ation manual R32 Split system air conditioners English Installation manual R32 Split system air conditioners RXA20A5V1B9 RXA25A5V1B9 RXA35A5V1B9 RXM20R5V1B9 RXM25R5V1B9 RXM35R5V1B9 ARXM25R5V1B9 ARXM35...

Page 2: ...bus eksploatuojami laikantis m s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpiso...

Page 3: ...t the products are used in accordance with our instructions as amended S I 2008 1597 Supply of Machinery Safety Regulations 2008 S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 109...

Page 4: ...run 13 11 Troubleshooting 13 11 1 Fault diagnosis using LED on outdoor unit PCB 13 12 Disposal 13 13 Technical data 13 13 1 Wiring diagram 13 13 1 1 Unified wiring diagram legend 13 1 About the docum...

Page 5: ...his would cause refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT open the stop valves before the vacuum drying is finished Charging refrigerant see 6 Charging refrigerant 49 WARNING The refrige...

Page 6: ...cing Install the switch box cover before turning ON the power supply Configuration see 9 Configuration 411 WARNING Before connecting or disconnecting the connector make sure the power supply is turned...

Page 7: ...against direct snowfall and take care that the outdoor unit is NEVER snowed up a b c c d a Snow cover or shed b Pedestal c Prevailing wind direction d Air outlet It is recommended to provide at least...

Page 8: ...and height difference What Distance Maximum allowable pipe length 20 m Minimum allowable pipe length 1 5 m Maximum allowable height difference 15 m 5 2 Connecting the refrigerant piping DANGER RISK O...

Page 9: ...lves after installing the refrigerant piping and performing vacuum drying Running the system with the stop valves closed may break the compressor 6 Charging refrigerant 6 1 About the refrigerant This...

Page 10: ...he GWP value mentioned on the refrigerant charge label 2 Fix the label on the inside of the outdoor unit near the gas and liquid stop valves 7 Electrical installation DANGER RISK OF ELECTROCUTION WARN...

Page 11: ...1 Remove the service cover 2 Open the wire clamp 3 Connect the interconnection cable and power supply as follows f 50 Hz 220 240 V a b c d e a Interconnection cable b Power supply cable c Circuit brea...

Page 12: ...saving connector 3 Turn ON the main power supply 10 Commissioning NOTICE General commissioning checklist Next to the commissioning instructions in this chapter a general commissioning checklist is als...

Page 13: ...r saving 2 Power supply fault 3 Turn the power OFF and back ON and check the LED within approximately 3 minutes If the LED is OFF again the outdoor unit PCB is faulty DANGER RISK OF ELECTROCUTION When...

Page 14: ...M Pulse amplitude modulation PCB Printed circuit board PM Power module PS Switching power supply PTC PTC thermistor Q Insulated gate bipolar transistor IGBT Q C Circuit breaker Q DI KLM Earth leak cir...

Page 15: ......

Page 16: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 1S 2022 11 Copyright 20...

Reviews: