background image

10 Commissioning

Installation manual

12

RXA-A9, RXM-R9, ARXM-R9

R32 Split system air conditioners

3P650253-1S – 2022.11

2

Remove the front plate.

3

Remove the drip proof cover.

4

Cut jumper J6 on the outdoor unit PCB.

J12

J11

J9

J8

J6

J5

INFORMATION

▪ The  indoor  unit  may  produce  Intermittent  noise  due  to

the outdoor unit fan turning ON and/or OFF.

▪ Do  NOT  place  humidifiers  or  other  items  which  might

raise humidity in rooms when you use the facility mode.

▪ Cutting jumper J6 sets the indoor unit fan to the highest

speed.

▪ Do  NOT  use  this  setting  in  residences  or  offices  with

people.

9.2

Standby electricity saving function

9.2.1

About the standby electricity saving
function

This mode turns OFF the power supply of the outdoor unit and sets
the  indoor  unit  into  the  standby  saving  mode  to  reduce  the  power
consumption of the unit.

This  mode  is  only  applicable  for  outdoor  units:  ARXM-R9,  RXM-R9
and indoor units: FTXM, ATXM, FVXM.

INFORMATION

The  standby  electricity  saving  can  ONLY  be  used  for  the
units described above.

WARNING

Before  connecting  or  disconnecting  the  connector,  make
sure the power supply is turned OFF.

INFORMATION

Selective  connector  for  standby  electricity  saving  is
required if other than applicable indoor unit is connected.

9.2.2

To turn ON standby electricity saving
function

Prerequisite: 

The main power supply MUST be turned OFF.

1

Remove the service cover.

2

Disconnect the selective standby electricity saving connector.

3

Turn ON the main power supply.

10

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during commissioning and
hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

10.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

The following 

field wiring

 has been carried out according

to  this  document  and  the  applicable  legislation  between
the outdoor unit and the indoor unit.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

Summary of Contents for RXA20A5V1B9

Page 1: ...ation manual R32 Split system air conditioners English Installation manual R32 Split system air conditioners RXA20A5V1B9 RXA25A5V1B9 RXA35A5V1B9 RXM20R5V1B9 RXM25R5V1B9 RXM35R5V1B9 ARXM25R5V1B9 ARXM35...

Page 2: ...bus eksploatuojami laikantis m s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpiso...

Page 3: ...t the products are used in accordance with our instructions as amended S I 2008 1597 Supply of Machinery Safety Regulations 2008 S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 109...

Page 4: ...run 13 11 Troubleshooting 13 11 1 Fault diagnosis using LED on outdoor unit PCB 13 12 Disposal 13 13 Technical data 13 13 1 Wiring diagram 13 13 1 1 Unified wiring diagram legend 13 1 About the docum...

Page 5: ...his would cause refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT open the stop valves before the vacuum drying is finished Charging refrigerant see 6 Charging refrigerant 49 WARNING The refrige...

Page 6: ...cing Install the switch box cover before turning ON the power supply Configuration see 9 Configuration 411 WARNING Before connecting or disconnecting the connector make sure the power supply is turned...

Page 7: ...against direct snowfall and take care that the outdoor unit is NEVER snowed up a b c c d a Snow cover or shed b Pedestal c Prevailing wind direction d Air outlet It is recommended to provide at least...

Page 8: ...and height difference What Distance Maximum allowable pipe length 20 m Minimum allowable pipe length 1 5 m Maximum allowable height difference 15 m 5 2 Connecting the refrigerant piping DANGER RISK O...

Page 9: ...lves after installing the refrigerant piping and performing vacuum drying Running the system with the stop valves closed may break the compressor 6 Charging refrigerant 6 1 About the refrigerant This...

Page 10: ...he GWP value mentioned on the refrigerant charge label 2 Fix the label on the inside of the outdoor unit near the gas and liquid stop valves 7 Electrical installation DANGER RISK OF ELECTROCUTION WARN...

Page 11: ...1 Remove the service cover 2 Open the wire clamp 3 Connect the interconnection cable and power supply as follows f 50 Hz 220 240 V a b c d e a Interconnection cable b Power supply cable c Circuit brea...

Page 12: ...saving connector 3 Turn ON the main power supply 10 Commissioning NOTICE General commissioning checklist Next to the commissioning instructions in this chapter a general commissioning checklist is als...

Page 13: ...r saving 2 Power supply fault 3 Turn the power OFF and back ON and check the LED within approximately 3 minutes If the LED is OFF again the outdoor unit PCB is faulty DANGER RISK OF ELECTROCUTION When...

Page 14: ...M Pulse amplitude modulation PCB Printed circuit board PM Power module PS Switching power supply PTC PTC thermistor Q Insulated gate bipolar transistor IGBT Q C Circuit breaker Q DI KLM Earth leak cir...

Page 15: ......

Page 16: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 1S 2022 11 Copyright 20...

Reviews: