10
4
INSTALLATION
4.1
Installation measurements
Unit with pipes connected downwards:
Unit + mounting bracket
A =
Supply CH
G
¾
” (ext)
B =
Return CH
G
¾
” (ext)
C =
Gas
G
½
” (int)
D =
Condense outlet
Ø dn25 (flexible)
h =
517mm
RHOB12AAV1H &
RHOB18AAV1H
637mm
RHOB42AAV1H
H =
590mm
RHOB12AAV1H &
RHOB18AAV1H
710mm
RHOB42AAV1H
Z =
Flue gas outlet/air inlet
Ø60/100 (concentric)
Summary of Contents for ROTEX GW-20 H12
Page 1: ...ROTEX 4P374380 1D 88554801 02 2016 4P374380 1D 88554801 02 2016...
Page 29: ...30...
Page 81: ...30...
Page 133: ...30...
Page 185: ...30...
Page 237: ...30...
Page 290: ...30...
Page 342: ...30...
Page 395: ...31...
Page 421: ...57...
Page 422: ...58...
Page 423: ...59...
Page 424: ...ROTEX 008 1548799_00 88554803 05 2018 4P374380 1D 88554801 02 2016...