![background image](http://html1.mh-extra.com/html/daikin/rkn18nmvju/rkn18nmvju_service-manual_2459845012.webp)
PCB
Si001556E
10
Removal Procedure
4. PCB
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1
Remove the screw of
the terminal board.
2
Remove the earth /
ground screw and pull
out the clamp from the
mounting plate for
terminal board.
3
Remove the earth /
ground screw from the
electrical box.
Terminal board
(R21894)
Clamp
Terminal board mounting plate
Earth / ground screw
(R21895)
Earth / ground screw
Electrical box
(R21896)