background image

Installation and operation manual

4

Indoor unit installation

As for the parts to be used for installation work, be sure to use the
provided accessories and specified parts designated by our
company.

Make sure wiring, piping and drain piping meets your customer's
requirements and must comply with local and national regulations.

How to open and close the front panel 
(for FXLQ units only)

To open the front panel, remove 4 screws from the corner pieces,
unhook the corner pieces and remove the front panel as shown in the
figure below.

To close the front panel, use the opposite method.

Floorstanding installation

1

Level the indoor unit with the
leveling screws (accessory part).
If the floor is too uneven to level
the unit, place the unit on a flat
and level base.

2

If the unit is in danger of falling over, either fasten to the wall
using the holes provided, or fasten to the floor with a field
supplied floor fastener.

Wallmounted installation

1

Positioning of holes for fastening to the wall.
Unit of measurement = mm.

2

The legs can be removed if the indoor unit is to be hung on a
wall. To do so, remove the legs and mount the 2 decorationstrips
to the corner pieces as shown in the figures below.

For 

FXLQ

 units only

Ensure the unit is level when installed so that drainage
flows smoothly. If inclined, water can leak.

Make sure that the floor is strong enough to bear the unit
weight.

1

1

2

2

3

2

2

1

1

2

2

Check whether the wall is strong enough to bear the
weight of the unit. If there is a risk, reinforce the wall
before installing the unit.

Use the installation mount on the rear of the unit for
installation.

The unit requires minimum 100 mm
clearance on the bottomside for air
intake and maximum 20 mm
clearance from the wall by using
spacers (field supply).

Model

A (mm)

20 + 25

590

32 + 40

730

50 + 63

1010

A

≤20

100≤

A

≤200

A

205

205

192

232

1

1

5

6

7

3

5

2

6

5

2

5

4

4

01_4PEN323720-1E.book  Page 4  Tuesday, October 3, 2017  4:34 PM

Summary of Contents for FXLQ20P5VEB

Page 1: ...INSTALLATION AND OPERATION MANUAL FXLQ20P5VEB FXLQ25P5VEB FXLQ32P5VEB FXLQ40P5VEB FXLQ50P5VEB FXLQ63P5VEB System air conditioners 01_4PEN323720 1E book Page 1 Tuesday October 3 2017 4 34 PM...

Page 2: ...x L N L N P1 P2 P1 P2 P1 P2 P1 P2 P1 P2 F1 F2 T1 T2 P1 P2 F1 F2 T1 T2 P1 P2 F1 F2 T1 T2 P1 P2 F1 F2 T1 T2 3 1 4 2 L N L N L N L N 2 1 2 3 7 9 8 10 4 5 6 L N IN D OUT D F1 F2 F1 F2 Control box L N P1 P...

Page 3: ...ajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartus ir a...

Page 4: ...corrosive gas like sulphurous gas exists Copper tubing and brazed spots may corrode Where volatile flammable gas like thinner or gasoline is used Where machines generating electromagnetic waves exist...

Page 5: ...9 1 7 6 3 0 11 58 FXLQ63P5VEB 4 9 2 2 8 0 11 59 1x 1x 4x 1x 1x 1x 1 2 3 5 6 1x 8 8x 7 4 Tick 3 when checked Is the indoor unit fixed firmly The unit may drop vibrate or make noise Is the gas leak test...

Page 6: ...This is to prevent image interference and noise in those electrical appliances Noise may be generated depending on the conditions under which the electric wave is generated even if 1 meter is kept Whe...

Page 7: ...sten to the floor with a field supplied floor fastener Wallmounted installation 1 Positioning of holes for fastening to the wall Unit of measurement mm 2 The legs can be removed if the indoor unit is...

Page 8: ...leaks When connecting the flare nut coat the flare inner surface with ether oil or ester oil and initially tighten 3 or 4 turns by hand before tightening firmly Finally insulate as shown in the figure...

Page 9: ...um pump which can evacuate to 100 7 kPa 5 Torr 755 mm Hg Drain piping work Rig the drain pipe as shown below Improperly rigged piping could lead to leaks and eventually wet furniture and belongings 1...

Page 10: ...sive force to the terminal Use torques according to the table below When attaching the control box lid make sure not to pinch any wires and make sure that the wiring does not come in contact with the...

Page 11: ...Circuit Amps A MFA Maximum Fuse Amps A FLA Full Load Amps A NOTE For details refer to Electrical data in the technical data book Power supply wiring Model Field fuses Wire Size 20 63 16 A H05VV U3G L...

Page 12: ...put from outside to terminals T1 and T2 of the terminal board remote controller to transmission wiring 2 Actuation The following table explains forced off and on off operations in response to input A...

Page 13: ...terminals T1 T2 U4 or UH The power on the outdoor unit is off The outdoor unit has not been wired for power supply Incorrect transmission no display The power on the indoor unit is off The indoor uni...

Page 14: ...onsumption even if the system is not operating The remote controller display is turned off when the main power switch is turned off Disposal requirements Your product and the batteries supplied with t...

Page 15: ...C RECEIVER F U FU FOR CHARACTERISTICS REFER TOPCBINSIDE YOUR UNIT FUSE S C LIMIT SWITCH FG CONNECTOR FRAMEGROUND S L FLOAT SWITCH H HARNESS S NPH PRESSURESENSOR HIGH H P LED V L PILOT LAMP LIGHT EMITT...

Page 16: ...7 1 2019 12 Copyright 2019 Daikin DAIKIN ISITMA VE SO UTMA S STEMLER SAN T C A G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe STANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 0...

Reviews: